Chapter 4: Connecting the AC and the Strings to the Connection Unit

Chapter 4: Connecting the AC and the Strings
to the Connection Unit
This chapter describes how to:
Connect the Connection Unit to the AC grid, and to the PV strings.
If required connect additional grounding, for example for installations in locations
requiring earth rod.
To connect the AC grid and grounding to the Connection Unit:
1. Turn OFF the AC circuit breaker.
2. Open the Connection Unit cover: Release the four Allen screws and carefully move
the cover horizontally before lowering it.
CAUTION!
When removing the cover, make sure not to damage internal components.
SolarEdge will not be held responsible for any components damaged as a
result of incautious cover removal.
3. Strip the required length of the external and internal cables insulation.
EV Charging Single Phase Inverter Guide MAN-01-00583-1.1
Figure 12: Inside the Connection Unit
Figure 13: Insulation stripping – AC
    31