Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each inverter.
2. Select Status and verify that inverter is operating and producing power (see also Viewing System
Status on page 47).
3. Verify that the number of paired optimisers is the same as the number of physically installed power
optimisers.
4. Verify that additional configurations were properly set by viewing the relevant Status screens.
5. Verify that the green inverter LED is steadily lit.
Your SolarEdge power harvesting system is now operational.
Viewing System Status
During normal operation, the Status screen displays all the inverter settings and operation status. Scroll
up or down to display various status parameters a s described in the following sections.
The LED indication provides m ore information about system performance; Refer toLEDs on page 23LEDs
on page 1.
To access the Status screen:
From the Commissioning menu select Status. The main inverter Status screen is displayed (see below).
A red or orange icon (for example: ) may appear at the top left corner of a status cell, indicating an
error. The color indicates error severity (red is top severity). The error description or information appears
on the screen. Tap the error line for more information and troubleshooting instructions, and refer to
Errors and Troubleshooting on page 70.
A gray clock icon (
) may appear at the top left corner of a status cell, indicating a temporary status,
such as a connection process. When the process is complete, the icon disappears and a constant status
message is displayed.
Main Inverter Status
Power
100 kW
P_OK: 138 of 141
Optimizers Connected
Status
Production
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
Status
Inverter
SN 07318000C
Voltage
Frequency
277 Vac
60.9 Hz
Server Comm.
S_OK
(LAN)
Switch
OFF
47