The material furnished in this document is believed to be accurate and reliable. However, SolarEdge assumes no responsibility for the use of this material. SolarEdge reserves the right to make changes to the material at any time and without notice. You may refer to the SolarEdge web site (https://www.solaredge.com/us/) for the most...
Page 3
FCC Compliance Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance may void the user’s authority to operate the equipment.
Support and Contact Information 3 Support and Contact Information If you have technical problems concerning SolarEdge products, please contact us: USA and Canada: 1 510 498 3200 Worldwide: +972 073 2403118 Fax: +1 (530) 273-2769 Email: ussupport@solaredge.com. Support Center: https://www.solaredge.com/us/service/support ...
Page 5
System configuration information, including the type and number of modules connected and the number and length of strings. The communication method to the SolarEdge server, if the site is connected. The inverter software version as appears in the status screen.
Important Notice FCC Compliance Support and Contact Information HANDLING AND SAFETY INSTRUCTIONS Safety Symbols Information IMPORTANT SAFETY INSTRUCTIONS Chapter 1: Introducing the SolarEdge Power Harvesting System Power Optimizer EV Charging Single Phase Inverter Monitoring Platform Supported AC Grids Installation Procedure Installation Equipment List...
Page 7
Support and Contact Information Step 3: Verifying Proper Activation and Commissioning Viewing System Status Reporting and Monitoring Installation Data Chapter 5: Setting Up Communication to the Monitoring Platform Communication Options Communication Connectors Removing the Inverter Cover Removing the Connection Unit with Safety Switch Cover Creating an Ethernet (LAN) Connection Creating an RS485 Bus Connection Verifying the Connection...
HANDLING AND SAFETY INSTRUCTIONS 7 HANDLING AND SAFETY INSTRUCTIONS During installation, testing and inspection, adherence to all the handling and safety instructions is mandatory. Failure to do so may result in injury or loss of life and damage to the equipment. Safety Symbols Information The following safety symbols are used in this document.
IMPORTANT SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS CONSIGNES DE SÉCURITÉ IMPORTANTES CONSERVEZ CES INSTRUCTIONS WARNING! When using electric products, basic precautions should always be followed, including the following. This manual contains important instructions that shall be followed during installation, operation and maintenance of the unit. a.
Page 10
IMPORTANT SAFETY INSTRUCTIONS 9 l’isolant est endommagé, ou s’il présente tout autre signe d’endommagement. e. Ne pas utiliser ce produit si le boîtier ou la prise EV est endommagé, fissuré, ouvert, ou s’il présente tout autre signe d’endommagement. 1. Un conducteur de mise à la terre isolé dont les dimensions, le matériau d'isolation et l'épaisseur sont identiques aux conducteurs d'alimentation de circuit de dérivation mis à...
Page 11
IMPORTANT SAFETY INSTRUCTIONS WARNING! Opening the inverter and repairing or testing under power must be performed only by qualified service personnel familiar with this inverter. AVERTISSEMENT! L’unité ne doit être ouverte que par un technicien qualifié dans le cadre de l'installation et de la maintenance.
Page 12
State of California to cause cancer. For more information, go to www.P65Warnings.ca.gov AVERTISSEMENT! Les produits SolarEdge peut vous exposer à des agents chimiques, y compris trioxyde d'antimoine, identifiés par l'État de Californie comme pouvant causer le cancer. Pour de plus amples informations, prière de consulter www.P65Warnings.ca.gov.
Page 13
IMPORTANT SAFETY INSTRUCTIONS NOTE A SolarEdge inverter may be installed in a site with a generator. SolarEdge requires installing a physical or electronic interlock, which will signal to the inverter when the grid has been disconnected. Interlock procurement, installation, maintenance and support are the responsibility of the installer.
Chapter 1: Introducing the SolarEdge Power Harvesting System The SolarEdge power harvesting solution maximizes the power output from any type of solar Photovoltaic (PV) installation while reducing the average cost per watt. The following sections describe each of the system’s components.
Power Optimizer Power Optimizer The power optimizers are DC-DC converters connected to PV modules in order to maximize power harvesting by performing independent Maximum Power Point Tracking (MPPT) at the module level. The power optimizers regulate the string voltage at a constant level, regardless of string length and environmental conditions.
Figure 2: The EV Charger Cables (with holders) Monitoring Platform The monitoring platform enables monitoring the technical and financial performance of one or more SolarEdge sites. It provides past and present information on the system performance both at the system and module levels. Supported AC Grids The following figures illustrate grids that are supported by SolarEdge single phase inverters.
Page 17
Note that in some cases L1 and L2 are not interchangeable. In these places, L1 and L2 locations appear in the drawing. Figure 3: 240V AC grids supported by SolarEdge single phase inverter Figure 4: 208V AC grids supported by SolarEdge single phase inverter (1) 208V AC grids are only supported by some inverter models.
17 Installation Procedure The following is the procedure for installing and setting up a new SolarEdge site. Many of these also apply to modification of an existing site. 1. Connecting Power Optimizers in Strings, page 27. 2. Recording power optimizer serial numbers (optional), page 56.
Inverter Transport and Storage Wire strippers Voltmeter Mobile phone with latest SetApp version For installing the communication options, you may also need the following: For Ethernet: CAT5/6 twisted pair Ethernet cable with RJ45 connector If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper For RS485: Four- or six-wire shielded twisted pair cable Watchmaker precision screwdriver set...
Ne pas utiliser pas ce produit si l'appareil est endommagé. CAUTION! Do not use an extension cord between the SolarEdge EV Charger Cable and the EV Charging Single Phase Inverter. You may use a conversion adapter only if it has been approved by SolarEdge.
Chapter 2: Installing the Power Optimizers Chapter 2: Installing the Power Optimizers Safety The following notes and warnings apply when installing the power optimizers. Some of the following may not be applicable to smart modules: WARNING! The metallic enclosure of the power optimizer must be grounded in accordance with the product's listing and local and national codes.
Page 22
Le perçage de trous dans le cadre du module devra se faire suivant les instructions du fabricant. CAUTION! Installing a SolarEdge system without ensuring compatibility of the module connectors with the optimizer connectors may be unsafe and could cause functionality problems such as ground faults, resulting in inverter shut down. To ensure mechanical compatibility of the power optimizers’...
IMPORTANT SAFETY FEATURE Modules with SolarEdge power optimizers are safe. They carry only a low safety voltage before the inverter is turned ON. As long as the power optimizers are not connected to the inverter or the inverter is turned OFF, each power optimizer will output a safe voltage of 1V.
Page 24
Frame-mounted power optimizers are mounted directly on the module frame, regardless of racking system (rail-less or with rails). For installation of frame-mounted power optimizers, refer to http://www.solaredge.com/sites/default/files/installing_frame_ mounted_power_optimizers.pdf. The power optimizer can be placed in any orientation. If connecting more modules than optimizer inputs in parallel, use a branch cable.
For frame-mounted power optimizers follow the instructions supplied with the optimizers, or refer to https://www.solaredge.com/sites/default/files/installing_frame_mounted_power_ optimizers.pdf. 2. If required, mark the mounting hole locations and drill the hole. (1) Not applicable to smart modules.
Page 26
(1) These methods have been evaluated by a nationally recognized testing laboratory as part of the optimizer evaluation. The SolarEdge-supplied grounding lug kit has been evaluated only for use with SolarEdge power optimizers. It is not intended or listed to be used as a general purpose grounding lug with other electrical equipment.
Page 27
Figure 7: Power optimizer installation and grounding using a grounding plate For mounting on un-grounded structures (such as a wooden structure): If the star washer or the plate cannot be used, use the SolarEdge grounding lug (purchased separately) with an equipment-grounding conductor according to the supplied instructions.
Chapter 2: Installing the Power Optimizers 27 Figure 8: Power optimizer grounding terminal 5. Verify that each power optimizer is securely attached to the module support structure. 6. Record power optimizer serial numbers and locations, as described in Reporting and Monitoring Installation Data on page 55.
Make sure the PV modules are exposed to sunlight during this process. The power optimizer will only turn ON if the PV module provides at least 2W. In SolarEdge systems, due to the introduction of poweroptimizers between the PV modules and the inverter, the short circuit current I and the open circuit voltage V hold different meanings from those in traditional systems.
Page 30
Chapter 2: Installing the Power Optimizers 29 For troubleshooting power optimizer operation problems, refer to Power Optimizer Troubleshooting on page 74. EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Identifying the Inverter Refer to the sticker on the inverter that specifies its Serial Number and its Electrical Ratings. Provide the serial number when contacting SolarEdge support. The serial number is also required when opening a new site in the monitoring platform.
Page 32
Chapter 3: Installing the Inverter 31 Connection Unit with Safety Switch Interface EV Charger cable connector: Used for connecting the EV charger cable to the inverter EV Charger LED indicator: Three LEDs indicate the EV Charger statuses. Figure 11: LEDs The following table lists the LED indications when the EV Charger Cable is connected to the inverter and activated (refer to the EV Charger Cable Installation Guide supplied with the EV Charger Cable): Color...
Page 33
Inverter Interfaces EV Charger pushbutton: Pressing the button on the Connection Unit with Safety Switch has the following functionality: For a system with scheduled charging: Start charging immediately (not during charging scheduled times). For setting a charging schedule, refer to the EV Charger Cable Installation Guide (supplied with the EV Charger Cable).
Chapter 3: Installing the Inverter 33 DIP Switches Set the circuit breaker rating DIP switches (see Figure 12 ). Figure 12: Safety Switch with EV Charger internal interfaces To set the circuit breaker ratings: Use the circuit breaker rating DIP switches to set circuit breaker ratings. ...
Page 35
Opening Conduit Drill Guides To open conduit drill guides: 1. Move the Connection Unit with Safety Switch ON/OFF/P switch and the inverter ON/OFF/P switch to OFF. 2. Loosen the screws on the front cover of the Connection Unit with Safety Switch, as shown below: Figure 13: Opening the Connection Unit with Safety Switch cover 3.
ATTENTION! Les onduleurs SolarEdge peuvent être installés à une distance minimum de 50m de la ligne d'eau de l'océan ou autre environnement salin, tant qu'il n'y a pas d'éclaboussements d'eau salée directs sur l'onduleur.
Page 37
Mounting the Inverter between the inverter and other objects: Figure 16: Clearance areas 8" (20 cm) from the top of the inverter. At least 18" (45 cm) from the bottom of the inverter if installing it indoors, 24” (60 cm) if outdoors; if conduit entry to the Connection Unit with Safety Switch will be from the bottom, leave sufficient clearance for the conduits as well.
Page 38
Chapter 3: Installing the Inverter 37 Figure 17: Hanging the inverter on the brackets 6. Optionally, secure the Connection Unit with Safety Switch bracket to the wall/pole, using 3 screws: NOTE In case of inverter replacement with the Connection Unit with Safety Switch still mounted, it is recommended to use all 3 holes.
Chapter 3: Connecting the AC and the Strings to the Connection Unit with Safety Switch Chapter 3: Connecting the AC and the Strings to the Connection Unit with Safety Switch The Connection Unit with Safety Switch disconnects all ungrounded DC conductors of the circuit to which it is connected in compliance with the National Electric Code, and specifically NEC690.3, which addresses ungrounded PV arrays.
Chapter 3: Connecting the AC and the Strings to the Connection Unit with Safety Switch 39 NOTE For more wiring information refer to the SolarEdge Recommended AC Wiring Application Note , available on the SolarEdge website at https://www.solaredge.com/sites/default/files/application- note-recommended-wiring.pdf Connecting the AC Grid to the Connection Unit with Safety Switch 1.
Page 41
Connecting the Strings to the Connection Unit with Safety Switch strings, it is recommended to run separate circuits to the Connection Unit with Safety Switch or to position the combiner box near the Connection Unit with Safety Switch. This simplifies commissioning by allowing testing and servicing near the inverter. NOTE Use 16-6 AWG, 75-90°C copper wires only.
Page 42
NOTE SolarEdge's fixed input voltage architecture enables the parallel strings to be of different lengths. Therefore, they do not need to have the same number of power optimizers, as long as the length of each string is within the permitted range.
Chapter 4: Activating, Commissioning and Configuring the System Chapter 4: Activating, Commissioning and Configuring the System You can connect communication options at this stage, as described in Setting Up Communication to the Monitoring Platform on page 58. Once all connections are made, the system should be activated and commissioned using the Inverter SetApp mobile application.
Chapter 4: Activating, Commissioning and Configuring the System 43 3. When the activation is complete, do one of the following: Select Activate Another Inverter to continue activating additional inverters. Select Start Commissioning for pairing and other system configuration. The Commissioning screen is displayed. Refer to the next section for more information.
Page 45
Step 2: Commissioning and Configuring the Installation If not already ON - turn ON AC to the inverter by turning ON the circuit breaker on the main distribution panel. Open SetApp and follow the instructions on the screen (scan the inverter bar- code;...
Page 46
The communication option used by the inverter to communicate with the monitoring platform. The communication option used to communicate between multiple SolarEdge devices or other external non-SolarEdge devices, such as electricity meters or loggers. 2. Tap the Server red arrow to set the communication method to be used for communication between devices and the SolarEdge monitoring platform.
Page 47
For P(Q) diagram refer to https://www.solaredge.com/sites/default/files/application_note_p_q_ diagram_of_se_inverters_en_and_na.pdf. NOTE SolarEdge inverters with “Grid Support” functionality (as marked on the inverter certification label), are compliant with UL 1741 Supplement A. The functionality is built into the inverter and no additional external device is required.
DSP 1/2 Version: The digital board firmware version NOTE Please have these numbers ready when you contact SolarEdge Support. Serial Number: The inverter serial number as appears on the enclosure sticker Error Log: Displays the last five errors, and enables resetting (clearing) the log...
Viewing System Status Viewing System Status During normal operation, the Status screen displays all the inverter settings and operation status. Scroll up or down to display various status parameters as described in the following sections. The LED indication provides more information about system performance; Refer to LEDs on page 31.
Page 50
Chapter 4: Activating, Commissioning and Configuring the System 49 Main Inverter Status Status Inverter SN 07318000C Power Voltage Frequency 7.6 kW 240Vac 60 Hz P_OK: 15 of 30 Server Comm. Optimizers S_OK Connected (LAN) Status Switch Production CosPhi Limit Country 1.00 No Limit USA2...
Page 51
CosPhi: Indicates the ratio between active and reactive power.A negative value indicates a lagging CosPhi. For more information, refer to the Power Control Application Note , available on the SolarEdge website at https://www.solaredge.com/sites/default/files/application_note_ power_control_configuration.pdf. Limit: The inverter maximum output power...
Page 52
Chapter 4: Activating, Commissioning and Configuring the System 51 Site Status The Site status screen shows the accumulated status of all inverters connected to a master inverter in a chain (bus) and the master inverter status. Status Site Production Limit Inverters 90 kW 1.00 MW...
Page 53
Number of devices connected out of all devices Temporarily displayed (with a clock sign): Initializing communication Connecting to a network Connecting to SolarEdge servers Error message (with the sign) EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Page 54
Chapter 4: Activating, Commissioning and Configuring the System 53 Inverter Energy Status Displays the total energy produced during the last day, month, year and since inverter installation. Inverter Energy Today This Month This Year 45 kWh 1.14 MWh 13.68 MWh ...
Page 55
Viewing System Status Meter Status Meters Production Meter SN: XXXXXXXX RS485-2 Status Modbus ID #2 Power Energy 7.60 kW 13.68MWh Export Meter SN: XXXXXXXX GPIO S0 meter 1000 pulses per kWh Power Energy 7.60 kW 13.68MWh › Commissioning Type and function: Displays the meter functionality (Production, Export, Import, Export+Import).
Reporting and Monitoring Installation Data NOTE Monitoring the site requires connecting the inverter to the monitoring platform, using any of the wired or wireless options available from SolarEdge. Refer to Setting Up Communication to the Monitoring Platform on page 58. The Monitoring Platform...
Page 57
The monitoring platform includes a built-in help system, that guides you through the monitoring functionality. For more information, refer to https://www.solaredge.com/products/pv- monitoring#/. Creating Logical and Physical Layout using Installation Information To display a logical layout, insert the inverter serial number in the new site created in the monitoring platform.
Page 58
Once the form is completed, use the Mapper to scan the 2D codes and create the map in the monitoring platform. Optionally, you can send the sticker sheet to SolarEdge Support for physical layout creation. EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
The following types of communication can be used to transfer the monitored information from the inverter to the monitoring platform. Only communication products offered by SolarEdge are supported. Ethernet Ethernet is used for a LAN connection. For connection instructions refer to Creating an Ethernet (LAN) Connection on page 63 EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Page 60
Built-in Revenue Grade Meter (RGM) see Connecting an External Meter to an Inverter on page 83. RS485-2: Enables connection of multiple SolarEdge devices and of non-SolarEdge devices over the same bus. For connection instructions refer to Creating an RS485 Bus Connection on page 66...
Communication Connectors Communication Connectors A communication gland with multiple openings is used for connection of the various communication options. The table below describes the functionality of each gland opening. Unused openings should remain sealed. Opening for cable size (diameter) Connection type 2.5 - 5 mm RS485 4.5 - 7 mm, with cut...
5. Open the inverter cover (see Figure 22 ). CAUTION! When removing the inverter cover, make sure not to damage the internal components. SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal. ATTENTION! Lors du retrait du couvercle, assurez-vous de ne pas endommager les composants internes.
Page 63
Removing the Connection Unit with Safety Switch Cover CAUTION! When removing the Connection Unit with Safety Switch cover, make sure not to damage the internal components. SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal. ATTENTION! Lors du retrait du couvercle, assurez-vous de ne pas endommager les composants internes.
For details refer to: https://www.solaredge.com/sites/default/files/overvoltage_ surge_protection_na.pdf. To connect the Ethernet cable: 1. Remove the inverter and Connection Unit with Safety Switch covers as described in Removing the Inverter Cover on page 61.
Page 65
Creating an Ethernet (LAN) Connection 3. Remove the plastic seal from one of the large openings. 4. Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through the gland opening in the inverter. 5.
Page 66
Chapter 5: Setting Up Communication to the Monitoring Platform 65 Wire Color 10Base-T Signal RJ45 Pin # 100Base-TX Signal T568B T568A White/Green White/Orange Receive+ Blue Blue Reserved White/Blue White/Blue Reserved Green Orange Received- White/Brown White/Brown Reserved Brown Brown Reserved Figure 25: Standard cable wiring 7.
You can connect more than one inverter to the same switch/router or to different switches/routers, as needed. Each inverter sends its monitored data independently to the SolarEdge monitoring platform. 10. The inverter is configured by default to LAN. If reconfiguration is required: a.
Page 68
If using a cable longer than 10 m/ 33 ft in areas where there is a risk of induced voltage surges by lightning, it is recommend to use external surge protection devices. For details refer to: https://www.solaredge.com/sites/default/files/overvoltage_ surge_protection_na.pdf. If grounded metal conduit are used for routing the communication wires, a lightning protection device is not required.
Verifying the Connection Server è LAN, Cellular or Wi-Fi RS485-2 è Protocol è SolarEdge èSolarEdge Master RS485-2 è Slave Detect The system starts automatic detection of the slave inverters connected to the master inverter. The inverter should report the correct number of slaves. If it does not, verify the connections and terminations.
Page 70
Chapter 5: Setting Up Communication to the Monitoring Platform 69 Status Inverter SN 07318000C Power Voltage Frequency S_OK Optimizers Connected Server Connected Status Switch Production CosPhi Limit Country 1.00 No Limit USA2 Voltage Temp Commissioning 2. Check that S_OK - Server Connected status appears in the main inverter section. 3.
Chapter 5: Errors and Troubleshooting Chapter 5: Errors and Troubleshooting This appendix describes general system problems, and how to troubleshoot them. For further assistance, contact SolarEdge Support. Identifying Errors Errors may be indicated in various system interfaces: On the inverter bottom panel, a red LED indicates an error.
EV Charger-related Troubleshooting For the following system errors, when an error occurs, the red LED lights ON and the buzzer beeps 10 times. The error message is displayed on the SolarEdge mobile app screen. If the error persists- contact SolarEdge Support. Error code...
Page 73
Charger tab of the Monitoring Ground Disconnected. Disconnect the EV Charger cable Ground Disconnected 1Cx6 Disconnect from EV from the vehicle. Contact SolarEdge Support. EV Charger over temperature Verify proper clearances around the 1Cx7 Over Temperature inverter and EV Charger Cable. After verification reconnect the EV charger cable to the EV.
Page 74
Displayed Error message Description and Troubleshooting -or- Tap Charge Now on the EV Charger tab of the Monitoring The SolarEdge EV charger does not charge vehicles that require Vent not supported 1CxC ventilation while charging. If this Disconnect from EV error occurs, the vehicle cannot be charged.
Power Optimizer Troubleshooting Power Optimizer Troubleshooting Problem Possible Cause and Troubleshooting Power optimizers are shaded. If you connected the inverter to the monitoring platform, retry pairing remotely (during Pairing failed sunlight). Make sure to leave the inverter ON/OFF/P switch ON and that S_OK appears in the status screen.
Page 76
±1% par string est voltage. raisonnable. 3. Contact SolarEdge Support. Do not continue before finding the problem and replacing the malfunctioning power optimizer. If a malfunction cannot be bypassed or resolved, skip the malfunctioning power optimizer, thus connecting a shorter string.
Mechanical Specifications Mechanical Specifications The following figure provides inverter dimensions in mm [in]. Figure 27: Inverter dimensions EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Fuse Replacement The inverter is equipped with a fuse, located at the top right corner of the inverter. Fuse replacement kits are available from SolarEdge or you can use other fuses with identical ratings. 1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking, indicating that the DC voltage is safe (<50V), or wait five minutes before continuing...
Replacing an Inverter The Connection Unit with Safety Switch 6. Verify proper system operation. Replacing an Inverter 1. Turn OFF the inverter ON/OFF/P switch, and wait until the green LED is blinking , indicating that the DC voltage is safe (<50V), or wait five minutes before continuing to the next step.
Page 80
Appendix A: Replacing and Adding System Components 79 Figure 30: Disconnecting the Connection Unit with Safety Switch from the inverter 9. Remove the screws securing the inverter to the mounting brackets and lift the inverter from the mounting bracket. Figure 31: Mounting brackets EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Replacing the Connection Unit with Safety Switch NOTE If you remove the old inverter and do not immediately install a new one, then: Lock the Connection Unit with Safety Switch in the OFF position using a lock on the switch. Secure the Connection Unit with Safety Switch bracket to the wall/pole, using 3 screws Use insulation tape to isolate each of the AC and DC wires.
Page 82
Appendix A: Replacing and Adding System Components 81 5. Disconnect the DC wires from the inverter and the AC wires from the Connection Unit with Safety Switch. 6. Disconnect the wires connected between the inverter and the Connection Unit with Safety Switch: Antenna cable from the communication board RS485 and/or Ethernet connection from the communication board Grounding cable...
Page 83
Replacing the Connection Unit with Safety Switch 11. Insert the wires from the inverter into the openings in the Connection Unit with Safety Switch and the ferrite bead. 12. Reconnect the cables: Follow the instructions of Installing the Inverter on page 30. 13.
Appendix B: Connecting an External Meter to an Inverter 83 Appendix B: Connecting an External Meter to an Inverter This section provides instructions for connecting an external meter to inverters with or without a Built in Revenue Grade Meter (RGM). Connecting an External Meter to an Inverter Remove the wires connected to the RS485-1 pins on the communication board (see figure below), and insert the external meter wires together with the original wires (two...
1 (adjustable from -0.85 to +0.85) range Total harmonic < 3% distortion GFDI Threshold Utility Monitoring, Islanding Protection, Country Configurable Thresholds (1) For other regional settings please contact SolarEdge support. EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
Page 86
Technical Specifications - EV Charging Single Phase Inverter (North America) 85 SE3800H- SE5000H- SE6000H- SE7600H- SE11400H- Unit INPUT Maximum DC 5900 7750 9300 11800 17650 Power Transformer-less, Ungrounded Maximum Input Voltage Nominal DC Input Voltage Maximum Input 10.5 13.5 16.5 30.5...
Connection. The default settings are in compliance with IEEE1547. Utility authorization is required to change these set-points. (1) Full power up to at least 50°C/122°F. For power de-rating information refer to : https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf EV Charging Single Phase Inverter Guide MAN-01-00588-1.1...
EV Charger and EV Charger Cable Specifications OUTPUT — AC AC Level 2 Charging Level Connection to the SolarEdge monitoring platform is required for first EV charging Rated AC Power Output (Grid & 9600 Nominal AC Output Voltage...
Page 89
EV Charger and EV Charger Cable Specifications EV Charger Ground Connection Yes, continuous Monitoring Via the monitoring app; Ethernet or ZigBee EV Charger Configuration connection is required STANDARD COMPLIANCE UL2594, UL2231-1, UL2231-2, NEC Article 625 Safety compliant EV Charger SAE J1772-2009 ...