Section 4 - Installation; Installation Checklist; Startup/Commissioning; Location And Clearances - York YLAA Series Installation Operation & Maintenance

Air-cooled scroll chillers with brazed plate heat exchanger style b (60 hz) 4-10 fan, 55 - 230 ton, 195 - 700 kw
Table of Contents

Advertisement

FORM 150.72-ICOM6
ISSUE DATE: 12/29/2017
To ensure warranty coverage, this equip-
ment must be commissioned and serviced
by an authorized Johnson Controls
service mechanic or a qualified service
person experienced in chiller installation.
Installation must comply with all appli-
cable codes, particularly in regard to elec-
trical wiring and other safety elements
such as relief valves, HP cutout settings,
design working pressures, and ventilation
requirements consistent with the amount
and type of refrigerant charge.
Lethal voltages exist within the control
panels. Before servicing, open and tag
all disconnect switches.

INSTALLATION CHECKLIST

The following items, 1 through 6, must be checked be-
fore placing the units in operation.
1. Inspect the unit for shipping damage.
2. Rig unit using spreader bars.
3. Open the unit only to install water piping sys-
tem. Do not remove protective covers from water
connections until piping is ready for attachment.
Check water piping to ensure cleanliness.
4. Pipe unit using good piping practice (see ASHRAE
handbook section 215 and 195).
5. Check to see that wiring is tight and meets NEC
and local codes.
6. Check to see that the unit is installed and operated
within limitations (See Operational Limitations
(English) on page 43).

STARTUP/COMMISSIONING

The following pages outline detailed procedures to be
followed to install and start-up the chiller.

LOCATION AND CLEARANCES

Units are designed for outdoor installations on ground
level, rooftop, or beside a building. Location should
be selected for minimum sun exposure and to insure
adequate supply of fresh air for the condenser. The
units must be installed with sufficient clearances for air
entrance to the condenser coil, for air discharge away
from the condenser, and for servicing access.
JOHNSON CONTROLS
SECTION 4 – INSTALLATION
In installations where winter operation is intended and
snow accumulations are expected, additional height
must be provided to ensure normal condenser air flow.
Clearances are listed in Figure 32 on page 88.
Foundation
The unit should be mounted on a flat and level founda-
tion, floor, or rooftop capable of supporting the entire
operating weight of the equipment. See Physical Data
YLAA0058 – YLAA0230 60Hz on page 46 for oper-
ating weight. If the unit is elevated beyond the normal
reach of service personnel, a suitable catwalk must be
capable of supporting service personnel, their equip-
ment, and the compressors.
Ground Level Locations
It is important that the units be installed on a substantial
base that will not settle. A one piece concrete slab with
footers extended below the frost line is highly recom-
mended. Additionally, the slab should not be tied to the
main building foundations as noise and vibration may
be transmitted. Mounting holes (5/8" dia.) are provided
in the steel channel for bolting the unit to its foundation
(see Dimensions on page 35).
For ground level installations, precautions should be
taken to protect the unit from tampering by or injury to
unauthorized persons. Screws and/or latches on access
panels will prevent casual tampering. However, further
safety precautions such as a fenced-in enclosure or
locking devices on the panels may be advisable.
Rooftop Locations
Choose a spot with adequate structural strength to
safely support the entire weight of the unit and service
personnel. Care must be taken not to damage the roof.
Consult the building contractor or architect if the roof
is bonded. Roof installations should have wooden
beams (treated to reduce deterioration), cork, rubber,
or spring type vibration isolators under the base to min-
imize vibration.
Noise Sensitive Locations
Efforts should be made to assure that the chiller is not
located next to occupied spaces or noise sensitive areas
where chiller noise level would be a problem. Chiller
noise is a result of compressor and fan operation.
4