Chapter 6: Setting Up Communication; Communication Options - SolarEdge SE5K Installation Manual

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

Chapter 6: Setting Up Communication

The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output
circuit).
Inverter information
Information of any other connected devices.
 
This chapter describes setting up communication between:
The inverter and the monitoring platform through the Internet (wired/ wireless),
or through a cellular connection.
Multiple inverters for a master/slave configuration.
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P
switch at the bottom of the inverter (and the switch of the DC Safety Unit if
applicable) is turned OFF, and the AC is turned OFF.
When configuring the communication parameters while the inverter cover is
removed , make sure that the ON/OFF/P switch (and the switch of the DC
Safety Unit if applicable) is OFF, and the AC is turned ON.

Communication Options

The following types of communication can be used to transfer the monitored
information from the inverter to the monitoring platform.
Only communication products offered by SolarEdge are supported.
Always connect the communication options when the relevant devices are powered
down - Commercial Gateway, inverter, etc.
Ethernet
Ethernet is used for a LAN connection. For connection instructions refer to Creating an
Ethernet (LAN) Connection on page 52 .
Three Phase System Installation Guide MAN-01-00505-1.2
Chapter 6: Setting Up Communication
    49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents