Revision History - SolarEdge SE5K Installation Manual

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

4
  Revision History

Revision History

Version 1.2 (Feb 2019)
Added appendix 'Determining the Circuit Breaker Size' and paragraph
referencing to it, in the 'Grid Connection Guidelines' section.
Updated guidelines for use of extension cables in power optimizer installation
Torque for plastic cover screws 10.3 N*m/ 7.5 lb-ft.
In Specifications:
Addition of footnote for MC4 inputs: Connection of additional strings in
parallel to a single input is allowed as long as the cumulative current
does not exceed 45A.
Removed the 'Recommended circuit breaker/ fuse size to use at the grid
connection point' table.
Version 1.0 (Aug. 2018)
Initial release