SolarEdge SE5K Installation Manual page 43

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

42
  Viewing System Status
Switch: Indicates the position of the inverter ON/OFF/P switch: On, Off, or P
position.
CosPhi: Indicates the ratio between active and reactive power.A negative value
indicates a lagging CosPhi.
For more information, refer to the Power Control Application
Note , available on the SolarEdge website at
https://www.solaredge.com/sites/default/files/application_note_power_
control_configuration.pdf
Limit: The inverter maximum output power
Country: The selected country and grid setting
Voltage (Vdc): The DC input voltage
Temp (°C or °F): The inverter heat sink temperature
Site Status
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
.
-Three Phase System Installation Guide MAN-01-00505-1.2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents