SolarEdge SE3000H-US Installation Manual page 4

Single phase inverter with hd-wave technology
Hide thumbs Also See for SE3000H-US:
Table of Contents

Advertisement

 
In Commissioning chapter:
l
 
Updated the activation sequence 
o
 
Removed RS232 reference
o
 
Rapid shutdown (PVRSS):
l
 
Added important safety information notes and warnings
o
 
For a compliant PV Rapid Shutdown installation, use no more than 30 optimizers per string.
o
 
Enabling PVRSS from the inverter menu is only required if the installed optimizers were 
o
manufactured before 2015, otherwise it is enabled by default.
 
Added testing PVRSS functionality after pairing
o
 
In Configuration Menu Options:
l
 
Communication section: 
o
 
Removed RS232 Conf
n
 
Added GSM Conf
n
 
Power Control section:
o
 
Removed Phase Balance link and info
n
 
Added a note about compliance with UL 1741 Supplement A.
n
 
Added link to P(Q) diagram application note
n
 
Maintenance section:
o
 
Added links to application notes (Upgrading the inverter using SD card; Isolation fault 
n
troubleshooting; Arc fault detection)
 
Removed Optimizer Conf
n
 
Status Screens updates:
l
 
Meter status screen - added Power and Energy lines
l
 
Telemetry status screen - updated
l
 
GSM status screen - new
l
 
Communication options - updated
l
 
Inverter cover removal sequence - updated
l
 
Added link to Arc Detection application note
l
 
Troubleshooting: 
l
 
Error codes moved to a separate document. A link was added to the manual.
o
 
Slave Detect and Slave List - updated
o
 
Updated the technical specification document
l
 
Removed Inverter Arc Detection and Interruption appendix
l
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
Revision History
3