Opening Conduit Drill Guides

 
Communication gland: For connection of inverter communication options. Refer to Setting Up 
l
Communication     on page 52 for more information.
 
Drain valve: Drains any moisture that may be accumulated in the unit.
l
 
LCD panel: Displays inverter information and configuration parameters
l
 
LCD LEDs: Three LEDs located to the right of the LCD indicate the following inverter statuses:
l
Color
Description
Green
Power production
Communication and 
Yellow
inverter shutdown
Red
All LEDs turn on while the inverter is being configured.
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
 1.  Move the     D C Safety Unit   a nd the inverter ON/OFF switch to OFF.
NOTE
When the Safety Switch is OFF (for example during maintenance) it may be locked to prevent safety 
hazard: 
1. Move the       s afety switch to the Lock position. 
2. Insert the lock through the knob opening and lock.
24
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
On - The inverter is producing power.
Blinking - Standby mode. The inverter is in Standby mode until its 
working voltage is reached. The inverter then enters Production 
mode and produces power. 
Off - The inverter is not producing power. This may be during Night 
mode, when the inverter ON/OFF switch is OFF or when an error 
occurs.
Blinking: 
 
Monitoring information is being received from a power 
o
optimizer. 
 
The inverter is being shut down.
o
On - There is an error. Refer to Errors and Troubleshooting on page 
Fault
62 for more information.
Blinking - The inverter is being shut down.