Step 4: Verifying Proper Power Optimizer Connection - SolarEdge SE3000H-US Installation Manual

Single phase inverter with hd-wave technology
Hide thumbs Also See for SE3000H-US:
Table of Contents

Advertisement

Step 4: Verifying Proper Power Optimizer Connection

 2.  Connect the rest of the power optimizers in the string in the same manner.
WARNING!
If using a dual-input power optimizer and some inputs are not used, seal the unused input 
connectors with the supplied pair of seals. 
 3.  If you intend to monitor the installation, using the monitoring platform, record the physical location 
of each power optimizer, as described in Providing Installation Information on page 36.
Step 4: Verifying Proper Power Optimizer
Connection
When a module is connected to a power optimizer, the power optimizer outputs a safe voltage of 1V 
(±0.1V). Therefore, the total string voltage should equal 1V times the number of power optimizers 
connected in series in the string. For example, if 10 power optimizers are connected in a string, then 10V 
should be produced.
Make sure the PV modules are exposed to sunlight during this process. The power optimizer will only   t urn 
ON if   t he PV module provides at least 2W. 
In SolarEdge systems, due to the introduction of poweroptimizers between the PV modules and the 
inverter, the short circuit current I
those in traditional systems. 
For more information about the SolarEdge   s ystem's string voltage and current, refer to 
 and I
 in SolarEdge Systems Technical Note, available on the SolarEdge website at:  
the V
OC
SC
http://www.solaredge.us/files/pdfs/isc_and_voc_in_solaredge_systems_technical_
note.pdf. 
To verify proper power optimizer connection:
Measure the voltage of each string individually before connecting it to the other strings or to the inverter. 
Verify correct polarity by measuring the string polarity with a voltmeter. Use a voltmeter with at least 
0.1V measurement accuracy.
NOTE
Since the inverter is not yet operating, you may measure the string voltage   a nd verify correct polarity 
on the DC wires inside the Connection Unit.
For troubleshooting power optimizer operation problems, refer to Power Optimizer Troubleshooting  on 
page 68.
22
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
Figure 9: Power optimizers connected in series
 and the open circuit voltage V
SC
 
 hold different meanings from 
OC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents