Colour High Volume Production System
Installation Guide
Pro C900 / Pro C900s and Peripherals
This document is to be used in conjunction with the relevant mainframe and peripheral
service manuals.

Advertisement

Table of Contents
loading

Summary of Contents for Ricoh Pro C900

  • Page 1 Colour High Volume Production System Installation Guide Pro C900 / Pro C900s and Peripherals This document is to be used in conjunction with the relevant mainframe and peripheral service manuals.
  • Page 2 Revision Table This table shows all the revisions made to this document. Revision No. Revision Date Reason June 2009 First revision Author: Roger Harvey Authorised: Ajith Manadeniya Colour High Volume Production System - Installation Guide Pro C900 Page 2 of 24...
  • Page 3: Table Of Contents

    Machine Run-up and Installation Requirements ..........5 Special Service Tools Requirements..............7 Machine Weight Distribution................8 Machine Dimensions..................... 9 Pro C900/ Pro C900s Recommended Space Requirements ......10 Paper Feed Combinations .................. 11 Finishing Combinations ..................12 Stage 1: Workshop Run-Up Procedure ............. 13 Stage 2: Transporting the machine ..............
  • Page 4: Introduction

    There are some settings that may need to be evaluated case by case to ensure they will suit your client. The main steps involved when installing the Pro C900/ Pro C900s can be summarised in the following steps: 1. Workshop run-up procedure 2.
  • Page 5: Machine Run-Up And Installation Requirements

    Machine Run-up and Installation Requirements The following items are required to run up and install the Pro C900/ Pro C900s mainframe: Qty Item Notes Silicon Oil Three bottles of silicon oil for the machine (when on-site) and three Type SS bottles for the customer.
  • Page 6 1200mm x 1500mm x 19mm (D x W x H) the Rear particle board for the rear controller box to open out on too. Controller Colour High Volume Production System - Installation Guide Pro C900 Page 6 of 24...
  • Page 7: Special Service Tools Requirements

    Special Service Tools Requirements The following special tools need to be carried by each technician to complete run-up/ installation and to service the Pro C900/ Pro C900s mainframe and options. Item Notes Small Spirit No larger than 30cm in length to ensure Level the machine is level.
  • Page 8: Machine Weight Distribution

    The diagrams below show the machine’s weight distribution. Location Weight (kg) Location Weight (kg) a+b+c+d Colour High Volume Production System - Installation Guide Pro C900 Page 8 of 24...
  • Page 9: Machine Dimensions

    Machine Dimensions The diagrams below show the machine’s dimensions. Pro C900 with SR5000 Pro C900s with LCT, Cover Interposer, Z-Fold, Booklet Finisher and SR5000 Colour High Volume Production System - Installation Guide Pro C900 Page 9 of 24...
  • Page 10: Pro C900/ Pro C900S Recommended Space Requirements

    Please refer to Ricoh Document Q355: Recommended Work Area for a Ricoh Technician on Floor Equipment. This file can be located in the Technical Website/ Documents/ Pro C900 - Pro C900s / Installation Documents section. Please use the following link: http://partners.ricoh.com.au/web/aubase/technical/documents.nsf/allby...
  • Page 11: Paper Feed Combinations

    Paper Feed Combinations Pro C900 Pro C900s Colour High Volume Production System - Installation Guide Pro C900 Page 11 of 24...
  • Page 12: Finishing Combinations

    Finishing Combinations Minimum Configuration Maximum Configuration Colour High Volume Production System - Installation Guide Pro C900 Page 12 of 24...
  • Page 13: Stage 1: Workshop Run-Up Procedure

    Important: Do not include the Perfect Binder in the run-up procedure. All Pro C900/ Pro C900s models require a basic run-up procedure in the workshop prior to moving the machine to the customer’s site. It is recommended to allow two days for one technician to complete the workshop run-up procedure.
  • Page 14 13. Load 200 sheets of 100gsm A4 non-coated into Tray 1 14. Wait till the Pro C900 / Pro C900s comes to idle, then print out the full SMC report. Keep this initial SMC report with the machine throughout the run-up and installation process.
  • Page 15: Stage 2: Transporting The Machine

    Note: When installing the SR5000, booklet finisher, cover interposer and Z-fold, check RTB RG178020 Option Firmware Update PDF for the correct Z-Fold EPROM and firmware versions. Please use the following link to download the RTB, Technical Website/ Documents/ Pro C900 - Pro C900s / Installation Documents section; http://partners.ricoh.com.au/web/aubase/technical/documents.nsf /allbymodel/94D8EB5828119049CA2575D0008274B9?OpenDocum 20.
  • Page 16: Stage 3: On-Site Installation Procedure

    The production sales specialist is responsible for providing this document to the technician. The site survey will confirm all the necessary requirements for installing a Pro C900 / Pro C900s model at the customers’ site. It is recommended to allow two to three days (depending on the configuration) for one technician to complete the on-site installation procedure.
  • Page 17: Configuring The Machine

    13. Plug the power cord into the power source and turn the machine 14. Complete each MFP options’ (DOS, FFC and VM Card) installation procedure by referring to the Pro C900 / Pro C900s Service Manual one at a time.
  • Page 18 Set Punch Type to Multi Punch Left on display(GBC StreamPunch) • Set SR5000 staple Positions on the display • Specify ring binding and punch positions on the display Colour High Volume Production System - Installation Guide Pro C900 Page 18 of 24...
  • Page 19: Copy Quality Checks

    PQ check sample will be returned to the Technical Product Manager at National Technical Support. This file can be downloaded from the Technical Website/ Documents/ Pro C900 - Pro C900s / Installation Documents section. Please use the following link; http://partners.ricoh.com.au/web/aubase/technical/documents.nsf /allbymodel/48E0E2592AA4E8F2CA2575D00080B081?OpenDocum This PQ Check file sample will be the machine’s standard...
  • Page 20: Machine And Peripheral Checks

    Please perform the following steps to confirm the correct installation of the colour high volume production system: □ Pro C900 / Pro C900s mainframe, LCT and bypass ((Printer / Copier). a. Feed a total of 100 sheets from each Feed Station using both duplex and simplex modes □...
  • Page 21 □ Stacker (SK5000) a. If required, the Lead Edge and Side to Side Jogger position can be adjusted. Please refer to the Pro C900 / Pro C00s and the Stacker Service Manuals for full details. □ 3000 sheet finisher (SR5000).
  • Page 22: Stage 4: Documentation

    □ PS test page □ Colour registration check sample □ Ruled line check sample □ Image shift check samples from each tray □ Image skew check. Colour High Volume Production System - Installation Guide Pro C900 Page 22 of 24...
  • Page 23: Checklist Of Documents To Be Returned To National Technical Support

    Back up the Fiery settings to the 64mb Installation SD Card Customer machine training information All key operators of the Pro C900/ Pro C900s will receive operator training prior to the machine being handed over to the customer. Key operators will receive training by the Ricoh Production Education group in Sydney’s Production Innovation Centre.