Sequence of RUN3 to RUN5
This structured chart describes:
● Establishing and display of the actuating time/leak monitoring in RUN3
● Minimization of controller increments in RUN4
● Optimization of the transient response in RUN5
SIPART PS2 with and without HART
Operating Instructions, 10/2013, A5E00074631-11
7.2 Sequence of automatic initialization
Commissioning
121