Siemens SIPART Series Operating Instructions Manual page 119

Electropneumatic positioners with and without hart
Hide thumbs Also See for SIPART Series:
Table of Contents

Advertisement

7.2
Sequence of automatic initialization
Overview
The automatic initialization takes place in the following phases:
Automatic initialization phase
Start
RUN1
RUN2
RUN3
RUN4
RUN5
End
The following structured charts describe the sequence of initialization. The "Up/Down"
names indicate the direction of action of actuators.
SIPART PS2 with and without HART
Operating Instructions, 10/2013, A5E00074631-11
7.2 Sequence of automatic initialization
Description
-
Establishing the direction of action.
Checking the actuator travel and trimming the zero point
and the stroke.
Establishing and display of the actuating time (leak
monitoring)
Minimization of controller increments
Optimization of the transient response
-
Commissioning
117

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sipart ps2 series

Table of Contents