Chapter 9: System Configuration; Configuring The Rs485 Bus For Battery And Meter Connection - SolarEdge StorEdge SE5000-xxS0 series Installation Manual

For single battery or high capacity
Table of Contents

Advertisement

Chapter 9: System Configuration

This chapter describes how to configure your StorEdge system by setting up the communication 
between the system components and setting up the required   a pplication. 
Configuring the RS485 Bus for Battery and Meter
Connection
This section describes how to set up the RS485 communication between the       i nverter, meter and battery.
To configure the RS485 bus:
 1. Turn OFF or verify that the StorEdge Connection Unit switch   i s OFF.
 2. Turn the inverter ON/OFF switch to OFF.
 3. Select Communication è RS485-1 Conf è Device Type è Multi Devices. A list of devices is 
displayed.
D e v i c e
M e t e r
M e t e r
M e t e r
B a t t e r y
B a t t e r y
SolarEdge-StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
T y p e
< M L T >
1
< - - - >
2
< - - - >
3
< - - - >
1
< - - - >
2
< - - - >
Chapter 9: System Configuration
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents