Step 1: Activating The System - SolarEdge StorEdge SE5000-xxS0 series Installation Manual

For single battery or high capacity
Table of Contents

Advertisement

Step 1: Activating the System

 1. Verify that the inverter ON/OFF switch is OFF.
 2. Move the StorEdge Connection Unit switch to the ON position.
 3.  If not already removed, remove the inverter cover: Open the inverter cover's six Allen screws and
carefully pull the cover horizontally before lowering it.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is
removed.
 4.
Activate the inverter:
 a. Verify that the card S/N matches the inverter S/N.
 b. Insert the card into the slot marked "CARD" on the communication board.
 c. Turn AC ON.
 d. LCD shows: Running Script...èDone!
If LCD shows: Failed:
 
Turn AC OFF and ON (reset), and repeat the activation process.
l
Use the activation code that appears on the certification inverter label to manually activate the 
l
inverter.
If the problem persists, contact SolarEdge Support.
l
NOTE
You can use the activation code that appears on the certification inverter label to 
activate the inverter in case of a script error or a missing activation card.
 5. Verify that the inverter is configured to the proper country: Press the LCD light button until reaching 
the ID status screen: 
D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4
C P U : 0 0 0 3 . 1 4 x x
C o u n t r y : E S P
SolarEdge-StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
Figure 24: Activation card
Chapter 6: Commissioning the Installation
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents