Chapter 4: Installing the Backed-up Loads Panel and Meter

Chapter 4: Installing the Backed-up Loads
Panel and Meter
This chapter describes installation of the backed-up loads panel and a meter.

Installing the Backed-up Loads Panel

Install a secondary AC panel for backed-up loads (not supplied by SolarEdge). Rewire the backed-up loads 
through this panel. 
Install one pole 25A as the main circuit   b reaker.
Figure 10: Backed-up Loads Panel