Step 1: Mounting The Power Optimizers; Step 2: Connecting A Pv Module To A Power Optimizer - SolarEdge StorEdge SE5000-xxS0 series Installation Manual

For single battery or high capacity
Table of Contents

Advertisement

Step 1: Mounting the Power Optimizers

For each of the power optimizers
 1. Determine the power optimizer mounting location and use the power optimizer mounting brackets 
to attach the power optimizer to the support structure . For frame-mounted power optimizers 
follow the instructions supplied with the optimizers.
 2. If required, mark the mounting hole locations and drill the hole.
CAUTION!
Do not drill through the power optimizer or through the mounting holes. The drilling vibrations can
damage the power optimizer and will void the warranty.
 3. Attach each power optimizer to the rack using the M6 (1/4'') stainless steel bolts, nuts and washers.
Apply torque of 9.5 N*m / 7 lb*ft.
 4. Verify that each power optimizer is securely attached to the supporting structure or the module.
NOTE
Record power optimizer serial numbers and locations, as described in Providing Installation
Information on page 40.
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the plus and
minus input and output connectors.
For each of the power optimizers
Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power 
l
optimizer.
Connect the Minus (-) output connector of the module to the Minus (-) input connector of the 
l
power optimizer.
1 Not applicable to smart modules.
SolarEdge-StorEdge -Single Battery/High Capacity Installation MAN-01-00283-1.1
1
1
:
Figure 2: Power optimizer connectors
Chapter 2: Installing the Power Optimizers
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge se6000-xxs0 series

Table of Contents