Guide Specifications

PART 1 – GENERAL
1.01 SCOPE
A. The requirements of the General Conditions, Supplementary Conditions, Division 1,
and Drawings apply to all Work herein.
B. Provide Microprocessor controlled, multiple-scroll compressor, air-cooled, liquid chill-
ers of the scheduled capacities as shown and indicated on the Drawings, including but
not limited to:
1. Chiller package
2. Electrical power and control connections
3. Chilled water connections
4. Change of refrigerant oil (for factory mounted evaporator) or (evaporator shipped
separately for field installation and piping by contractor)

1.02 QUALITY ASSURANCE

C. Products shall be Designed, Tested, Rated and Certified in accordance with, and in-
stalled in compliance with applicable sections of the following Standards and Codes:
1. ANSI/ASHRAE Standard 15 – Safety Code for Mechanical Refrigeration
2. ASHRAE 90.1– Energy Efficiency compliance.
3. ANSI/NFPA Standard 70 – National Electrical Code (N.E.C.).
4. ASME Boiler & Pressure Vessel Code, Section VIII, Division 1.
5. ARI Standard 550/590 and 551/591 – Air Cooled Water-Chilling Packages.
6. Conform to Intertek Testing Services, formerly ETL, for construction of chillers and
provide ETL/cETL Listing label.
7. Manufactured in facility registered to ISO9002.
8. OSHA - Occupational Safety and Health Act
D. Factory Test: Chiller shall be pressure-tested, evacuated and fully charged with refrig-
erant and oil, and shall be factory operational run tested with water flowing through the
vessel.
E. Chiller manufacturer shall have a factory trained and supported service organization
that is within a 50 mile radius of the site.
F. Manufacturer shall Warrant all equipment and material of its manufacture against de-
fects in workmanship and material for a period of one year from date of initial start-up
or eighteen (18) months from date of shipment, whichever occurs first.