Configuring Storedge Applications; Backup Power Applications; System Basic Configuration - SolarEdge StorEdge Installation Manual

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Configuring StorEdge Applications

Configuring StorEdge Applications
This section describes the StorEdge applications and how to configure the system.

Backup Power Applications

The produced power is stored in the battery to be used during power outages. The StorEdge inverter 
senses the grid voltage, and when it is down it automatically switches to Backup mode, disconnecting  
from the grid and supplying   p ower to the backed-up loads. This application requires connection to   a  
backed-up loads panel. 
This application can be used in one of two ways:
Backup-only – energy stored in the battery is discharged for backup power only, that is, when there is 
 
no power from the grid
Backup with Smart Energy Management– use some of the battery energy for backup power, and the 
 
rest for maximize self-consumption(MSC) or charge/ discharge profile programming   ( for time of use 
arbitrage) applications.
For more information,   r efer to the StorEdge Applications Connection and Configuration 
Guide available at  
http://www.solaredge.com/sites/default/files/storedge_applications_connection_and_
configuration_guide.pdf.
The Backup application can be used whether or not PV modules are installed at the site. 
The backup function is disabled by default and can be enabled for on- grid only 
application, if backup is not needed.

System Basic Configuration

This section describes:
How to enable the Backup Configuration functionality, so that the system can be set up to the available 
 
applications (Backup-only or Backup+Smart Energy Management); If Backup Conf is disabled, the 
system will use the battery energy when PV production is not sufficient in MSC, or when using one of 
charge/discharge profiles that requires battery discharge. However stored energy will not be used to 
back up the loads in case of power outage. 
How to access use the Energy Ctrl menu; This menu is the base for setting up StorEdge applications 
 
available for the inverter.
To enable the Backup Configuration functionality:
 1.  Enter Setup mode to display the main menu:
C o u n t r y
L a n g u a g e
C o m m u n i c a t i o n
P o w e r
B a c k u p
D i s p l a y
M a i n t e n a n c e
I n f o r m a t i o n
 2.  From the main menu select Backup Conf.
B a c k u p
 3.  Select Backup  Enable. 
84
< I t a l y >
< E n g >
C o n t r o l
C o n f
< D i s >
< D i s >
StorEdge Inverter Installation Guide MAN-01-00390-1.1

Advertisement

Table of Contents
loading

Table of Contents