SolarEdge StorEdge Installation Manual page 86

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

 9.  To verify battery connection, select Battery Info and check that the   b attery information is displayed. 
If not, check the wiring to the battery:
S N :
< s e r i a l
M o d e l :
N a m e p l a t e [ k W H ] :
F W
V e r .
Make sure to have the battery serial number and firmware version at hand whenever contacting 
support.
To verify the connection:
 1.  Press the inverter external LCD light button to display the status screens one after the other: 
 a.  Check the RS485 communication status: 
w w w w w w w w
R S 4 8 5 - 1 < M L T > < 0 2 > < 0 2 >
The MLT under Dev denotes that the configuration is for multiple devices.
 
The number under Prot (protocol) should display the number of   c onfigured  devices.
 
The number under ## should display the number of detected   d evices.
 
The above screen shows an example of 2   d evices on the same bus (for example: meter and 
battery).
If the number of devices under Prot does not match the number   u nder ##, refer to 
Troubleshooting on page 92.
 b.  Check the meter(s): In the meter(s) status screen check that the status is OK. The following is an 
example of the status of an Export (or Export+Import) meter:
E x p o r t
S t a t u s :
P o w e r [ W ] :
E n e r g y [ W h ] :
If Comm. Error appears, refer to Troubleshooting on page 92.
 c.  Check the battery information: identification, charging status and power, and the operating 
mode.
B S N :
S O E :
T o t a l :
S t a t e :
If Comm. Error appears, refer to Communication   T roubleshooting on page 92.
 
StorEdge Inverter Installation Guide MAN-01-00390-1.1
# >
< X X X X X X >
N / A
< X X X X X >
D e v
P r o t
M e t e r
< O K / E r r o r # >
x x x x x . x
X X X X X . X
X X X X X X X X X
I D : 1 5
8 9 %
P W R :
< x > W h
C h a r g i n g
Chapter 8: System Configuration
# #
2 W
83

Advertisement

Table of Contents
loading

Table of Contents