Chapter 7: Setting Up Communication to the Monitoring Platform
Chapter 7: Setting Up Communication to the
Monitoring Platform
The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output circuit)
Inverter information
Information of any other connected devices
This chapter describes setting up communication between:
the inverter and the monitoring platform through the Internet (wired/ wireless), or through a cellular
connection
multiple inverters f or a master/slave configuration
Communication setup is not required for power harvesting, however it is needed for using the
monitoring platform.
CAUTION!
70
StorEdge Inverter Installation Guide MAN-01-00390-1.1