Providing Installation Information
Use one of the following methods to connect your PV system to the monitoring platform.
Mapper Application
Android
Use the Mapper smart-phone application t o scan the power optimizer and inverter 2D bar-codes, and
map the system physical layout in the m onitoring platform.This application is integrated with the
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimizer serial number to the correct location in the system
physical layout.
For detailed information, refer to the Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping power optimizers using the Mapper mobile application
iPhone
Use the Mapper smartphone application to scan the power optimizer and inverter 2D bar-codes. This
application creates an XML file that can be uploaded to the m onitoring platform during site registration.
The Mapper can be downloaded from the application stores.
For detailed information, refer to the Mapper Software Guide or to the Site Mapper demo
movie, available on the SolarEdge website at
http://www.solaredge.com/groups/installer-tools/site-mapper.
Creating a Site in the Monitoring Platform
Create the site in the monitoring platform using the registration form available at
https://monitoring.solaredge.com/solaredge-web/p/login. Fill out all required
information in the form, which includes information about your installation, as well as
details about its logical and physical mapping.
Paper Template
Fill out the Physical Layout Template (downloadable from the SolarEdge site) using the
detachable 2D barcode stickers on each power optimizer. Once the form is completed,
scan it and upload the scanned file to the m onitoring platform during site registration.
For an example paper template, refer to http://www.solaredge.com/files/pdfs/physical-
layout-template.pdf.
StorEdge Inverter Installation Guide MAN-01-00390-1.1
Chapter 5: Commissioning the Installation
49