Step 4: Reporting and Monitoring Installation Data

Step 4: Reporting and Monitoring Installation Data
NOTE
This step requires connecting one of the communication options. Refer to Setting Up
Communication to the Monitoring Platform on page 70.

The Monitoring System

The monitoring platform   e nables accessing   s ite information, including up-to-date 
information viewed in a physical or logical view. The monitoring platform is described in 
detail in the   M onitoring Platform User Guide, available on the SolarEdge website at 
http://www.solaredge.com/files/pdfs/solaredge-monitoring-platform-user-guide.pdf. 
The   m onitoring platform can display logical and physical layouts of the installed system, 
as follows:
Logical Layout: Shows a schematic logical layout of the components in the system, such as: inverters, 
strings and modules, as well as their electrical connectivity. This view enables you to see which 
modules are connected in each string, which strings are connected to each inverter, and so on.
Physical Layout: Shows a schematic physical layout of the components in the system, such as: 
inverters, strings and modules, as well as their electrical connectivity. This view enables a bird's eye 
view of the actual location of a system component.
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as modules, by comparing their performance to that of 
other components of the same type.
Pinpoint the location of alerted components using the physical layout.
See how components are connected to each other.
Pair power optimizers remotely.
To display a logical layout, insert the inverter  serial number in the new site created in the application. 
When the communication between the inverter and the monitoring server is established, the logical 
layout is displayed.
To display a physical layout, you need to map the locations of the installed power optimizers. To generate 
a physical mapping, use either the Site Mapper application or the physical layout editor in the monitoring 
platform.
The logical and physical mapping can be used for debugging a problem using the   m onitoring platform.
If you do not report the physical and logical mapping of the installed power optimizers to SolarEdge, the  
monitoring platform will show the logical layout indicating which power optimizers are connected to 
which inverter, but will not show strings or the physical location of power optimizers .
The inverter may be connected to the   m onitoring platform via LAN or by using a   Z igBee Gateway system 
or a   C ellular Plug-in. Alternatively, you can use RS485 chain (bus) connection to connect   m ultiple 
SolarEdge devices to one inverter that is already connected to the server, in a master/slave configuration. 
Refer to Setting Up Communication to the Monitoring Platform  on page 70 .