Step 3: Verifying Proper Activation - SolarEdge StorEdge Installation Manual

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

The countdown indicates the seconds remaining until entering the Production mode. This time is in 
accordance with local regulations and is typically between three to five minutes. 
When countdown is complete, the inverter enters Production mode and produces power. The steadily 
lit green inverter LED indicates this mode.

Step 3: Verifying Proper Activation

After the wake-up time is over, a status screen similar to the following appears on the inverter LCD panel:
V a c [ V ]
2 4 0 . 7
3 7 1 . 9
P _ O K :
X X X / Y Y Y
. . . . . . . . . . . . . . . . .
 1.  Verify the following: 
The green inverter LED is steadily lit.
 
The ON/OFF indicator on the LCD panel reads ON.
 
P_OK: XXX/YYY:   T here is a connection to the power optimizers and at least one power optimizer is 
 
sending monitoring data. Optimizers send telemetries in a frequency of up to 10 minutes.
S_OK appears, if the inverter is connected to the SolarEdge monitoring platform. 
 
Vac [V] specifies the measured grid AC output voltage. 
 
Vdc [v] specifies the DC input voltage, which should be approximately the inverter DC voltage (model 
 
dependent; refer to the inverter datasheet)
Pac [W] specifies the AC output power produced.
 
 2.  Take note of the serial number on the inverter label using the detachable 2D barcode sticker on each 
device. This information is used in the SolarEdge monitoring platform to identify this inverter.
Your SolarEdge power harvesting system is now operational.
StorEdge Inverter Installation Guide MAN-01-00390-1.1
V d c [ V ]
P a c [ W ]
2 3 4 9 . 3
< S _ O K >
O N
Chapter 5: Commissioning the Installation
47