SolarEdge StorEdge Installation Manual page 27

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Mounting the Inverter
 11.  Remove the StorEdge Connection Unit covers: 
 a.  Release the six screws attaching the StorEdge Connection Unit external cover to the enclosure and lift 
the cover.
 b.  Open the four internal screws securing the transparent cover to the   e nclosure and remove the 
cover.
 
Figure 12: Inverter Covers
24
StorEdge Inverter Installation Guide MAN-01-00390-1.1

Advertisement

Table of Contents
loading

Table of Contents