Storedge Connection Unit - SolarEdge StorEdge Installation Manual

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

StorEdge Connection Unit

StorEdge Connection Unit
The StorEdge Connection Unit may have either external connections (MC4 connectors and cable glands), 
or utilize cable conduits for connections. Figure 7 shows both types. Connections to each of the unit 
types are described separately throughout this guide if the connection method is different.
The StorEdge Connection Unit with cable glands (Figure 7- left) includes:
DC safety switch: disconnects both the positive and negative conductors of the PV and the positive 
 
and negative conductors of the battery.
AC output: Cable glands for connection of grid and backed up loads
 
DC input: Connectors for connection of the PV installation and the battery
 
Communication and control gland,   f or connection of inverter communication options, meter, 
 
battery thermal power 12V and battery control.
The StorEdge Connection Unit with conduit interfaces (Figure 7- right)   i ncludes:
DC safety switch: disconnects both the positive and negative conductors of the PV and the positive 
 
and negative conductors of the battery.
Openings for conduit entry: Four openings are ready to use and have sealing covers. Two openings 
 
are closed with drill guides. If required, open the drill guides as described in Opening Conduit Drill Guides 
on page 102. 
 
20
Figure 6: Inverter front view
Figure 7: StorEdge Connection Unit types
StorEdge Inverter Installation Guide MAN-01-00390-1.1