Revision History
Revision History
Version 1.1 (July 2018)
Clearance for three phase inverters installed side-by-side, outdoors: 5 cm / 2"
 
Power optimizer clearance - no clearance is required on the mounting bracket side
 
Addition of reference to troubleshooting undetected devices application note
 
Torque for grounding using the equipment grounding bus-bar: 3.4 N*M /   3 0 lb-in
 
Update of product names
 
Addition of possibility to use compatible connectors from third-party manufacturers 
 
Recommendation to mount the power optimizer in a location protected from direct sunlight
 
Updated warning about sealing unused power optimizer input connectors
 
Max distance between the battery and inverter is 70 ft / 20m 
 
Removal of StorEdge Connection Unit Replacement
 
Addition of caution - installation in saline environment
 
Update regarding use of extension cables in power optimizer installation guidelines
 
Removal of recommendation to connect the battery and set DIP switch when the battery is on the 
 
floor, for easier access 
Addition of   l ow battery SOE troubleshooting
 
Addition of important safety feature: restart behavior functionality
 
Addition of battery connection via conduit
 
Addition of link to the Designer web page
 
Addition of battery charge/ discharge self-test and troubleshooting
 
In Power Optimizer Installation chapter: 
 
Removed reference to racking models and their grounding methods
 
o
Removed mentioning of tracker
 
o
In inverter Installation chapter:
 
Added a caution about not altering the StorEdge Connection Unit enclosure: SolarEdge does not 
 
o
permit opening or puncturing the StorEdge Connection Unit in any location other than the pre-
defined drill guide locations, or otherwise altering the construction of the enclosure, as this may 
compromise safety and will void the warranty. 
Connection to/from the Connection Unit:
 
450V DC to BAT connector (DC- and DC+ connections) corrected in the connection diagram
 
o
Added a diagram of LG battery connection to inverter with 3 DIP switches 
 
o
In Configuration Menu Options:
 
Power Control section:
 
o
Removed Phase Balance link and info
 
Added link to P(Q) diagram application note
 
Maintenance section:
 
o
Added links to application notes (Upgrading the inverter using SD card; Isolation fault 
 
troubleshooting; Arc fault detection)
Removed Optimizer Conf
 
In System Configuration chapter: 
 
2
StorEdge Inverter Installation Guide MAN-01-00390-1.1

Advertisement

Table of Contents
loading

Table of Contents