SolarEdge StorEdge Installation Manual page 110

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

Appendix C: Replacing and Adding System Components
 4.  On LG Chem batteries - turn OFF the auxiliary power switch and the circuit breaker switch. 
Figure 52: LG Chem switches
 5.  Use a multimeter to verify that DC voltage is below 50V   a t the battery connection.
 6.  Disconnect the cables from the battery side and replace the battery.
 7.  Connect the battery to the system as described in Connecting to the Battery on page 32.
107
StorEdge Inverter Installation Guide MAN-01-00390-1.1

Advertisement

Table of Contents
loading

Table of Contents