Appendix C: Replacing and Adding System Components
2. Turn OFF the StorEdge Connection Unit and the AC switch of the distribution panel.
3. Open and remove the StorEdge Connection Unit cover.
4. Open and remove the transparent internal cover.
5. Remove the battery from the upper board of the StorEdge Connection Unit and replace with a new
standard 9V battery.
6. Close the StorEdge Connection Unit covers.
Figure 50: The battery holder
105
StorEdge Inverter Installation Guide MAN-01-00390-1.1