SolarEdge StorEdge Installation Manual
SolarEdge StorEdge Installation Manual

SolarEdge StorEdge Installation Manual

For smart energy management using lg chem batteries
Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

 
 
 
StorEdge Inverter
Installation Guide
For Smart Energy Management 
using LG Chem batteries
For Europe, APAC, Australia and South Africa
Version 1.1

Advertisement

Table of Contents
loading

Summary of Contents for SolarEdge StorEdge

  • Page 1       StorEdge Inverter Installation Guide For Smart Energy Management  using LG Chem batteries For Europe, APAC, Australia and South Africa Version 1.1...
  • Page 2 Added a caution about not altering the StorEdge Connection Unit enclosure: SolarEdge does not    permit opening or puncturing the StorEdge Connection Unit in any location other than the pre- defined drill guide locations, or otherwise altering the construction of the enclosure, as this may  compromise safety and will void the warranty.  Connection to/from the Connection Unit:    450V DC to BAT connector (DC- and DC+ connections) corrected in the connection diagram   Added a diagram of LG battery connection to inverter with 3 DIP switches    In Configuration Menu Options:    Power Control section:   Removed Phase Balance link and info    Added link to P(Q) diagram application note    Maintenance section:   Added links to application notes (Upgrading the inverter using SD card; Isolation fault     troubleshooting; Arc fault detection) Removed Optimizer Conf    In System Configuration chapter:     StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 3 Revision History The communication board firmware (CPU) version must be 3.xxxx and later on all SolarEdge    inverters at the same site Screens changed when configuring LG battery   StorEdge Control instructions and menu updated   Connection Unit replacement - removed    Updated links    Technical specification - updated          StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 4: Disclaimers

    All company and brand products and service names are trademarks or registered trademarks of their  respective holders. Patent marking notice: see http://www.solaredge.com/patent  The general terms and conditions of delivery of SolarEdge shall apply. The content of these documents is continually reviewed and amended, where necessary. However,  discrepancies cannot be excluded. No guarantee is made for the completeness of these documents. The images contained in this document are for illustrative purposes only and may vary depending on  product models. Emission Compliance This equipment has been tested and found to comply with the limits applied by the local regulations.  These limits are designed to provide reasonable protection against harmful interference in a residential  installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed  and used in accordance with the instructions, may cause harmful interference to radio communications.  However, there is no guarantee that interference will not occur in a particular installation. If this  equipment does cause harmful interference to radio or television reception, which can be determined by  turning the equipment off and on, you are encouraged to try to correct the interference by one or more  of the following measures: Reorient or relocate the receiving antenna.    Increase the separation between the equipment and the receiver.    Connect the equipment into an outlet on a circuit different from that to which the receiver is     connected. Consult the dealer or an experienced radio/TV technician for help.    Changes or modifications not expressly approved by the party responsible for compliance may void the  user’s authority to operate the equipment. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 5: Table Of Contents

    Chapter 3: Installing the Inverter Inverter Package Contents Identifying the Inverter Inverter Interfaces StorEdge Connection Unit Internal AC Breaker and Bypass Switch Mounting the Inverter Chapter 3: Installing the Backed-up Loads Panel and Meter Installing the Backed-up Loads Panel Energy Meter Installation Chapter 4: StorEdge Inverter Connections Installing the 9V Battery and Fuses Connecting the Strings to the Inverter - StorEdge Connection Unit with Glands Connecting the Strings to the Inverter - StorEdge Connection Unit with Conduits Connecting to the Battery DIP Switch Setup Connecting Communication to the Meter Battery Grounding Connecting to the AC Grid and to Backed-up Loads Chapter 5: Commissioning the Installation...
  • Page 6 Display Maintenance Information Status Screens - Operational Mode Initial   S tatus Main Inverter Status Energy Meter Status Telemetry Status ID Status Server Communication Status IP Status ZigBee Status Wi-Fi Status GSM Status Communication Ports Status Smart Energy Management Status Power Control Status Battery Status Charge/ Discharge Profile Programming Status Chapter 7: Setting Up Communication to the Monitoring Platform Communication Options Ethernet RS485 Wi-Fi Cellular StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 7 Battery   T roubleshooting Power Optimizer Troubleshooting StorEdge Connection Unit LEDs Additional StorEdge Troubleshooting StorEdge-related Errors Codes System Warnings Appendix B: Opening Conduit Drill Guides Appendix C: Replacing and Adding System Components Replacing an Inverter 9V Battery Replacement Fuse Replacement Battery Replacement Appendix D: Mechanical Specifications Inverter Dimensions StorEdge Inverter for High Power Technical Specifications StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 8: Handling And Safety Instructions

    NOTE Denotes additional information about the current subject. IMPORTANT SAFETY FEATURE Denotes information about safety issues. Disposal requirements under the Waste Electrical and Electronic Equipment (WEEE) regulations: NOTE Discard this product according to local regulations or send it back to SolarEdge.     StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 9: Important Inverter Safety Instructions

    HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a lifting aid. NOTE The StorEdge Connection Unit is NEMA type 3R rated . Unused glands should be sealed with appropriate seals. NOTE Use PV modules rated according to IEC 61730 class A.
  • Page 10 NOTE A SolarEdge inverter may be installed in a site with a generator, however must not operate at the same time as the generator. Operating an inverter and a generator simultaneously will void the warranty. SolarEdge requires installing a physical or electronic interlock, which will prevent the generator and inverter from operating simultaneously.
  • Page 11 15 seconds (in DACH: 90 secnds). If this reoccurs 3 times, an error message is displayed and the inverter should be restarted by turning the ON/OFF switch OFF and then ON. Refer to StorEdge-related Errors Codes on page 100. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 12: Chapter 1: Overview

    StorEdge™ is SolarEdge's       a ll-in-one solution that uses a single phase DC optimized inverter to manage and  monitor both solar power generation and energy storage. Homeowners are automatically provided with  backup power in the event of grid   i nterruption to power pre-selected loads. Solar energy can be stored in  a battery for   S mart Energy Management applications such as export control, offering demand response  and peak shaving, and performing time of use shifting for reduced electric bills. The StorEdge Solution Components The StorEdge Inverter - The   i nverter manages   b attery and system   e nergy, in addition   t o its traditional       f unctionality as   a  DC-optimized   P V inverter. SolarEdge offers a StorEdge the following inverter types:  StorEdge inverter for Single Battery or High Capacity  ...
  • Page 13: About This Guide

    About this Guide About this Guide This document describes basic system connection and configuration - PV system (power  optimizer strings), one inverter, one battery, backed-up loads panel and one meter.  For additional configuration options refer to the StorEdge Solution Applications -  Connection and Configuration Guide, available at  http://www.solaredge.com/sites/default/files/storedge_backup_applications_ connection_and_configuration_guide.pdf.  StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 14: Installation Workflow

    Step 6 - Connecting AC and backed-up loads to the inverter - connect the   l oads (AC),   a nd meter. Refer  to StorEdge Inverter Connections on page 27. Step 7 - Commissioning the inverter - Activate the system and pair the power optimizers. Refer to  Commissioning the Installation on page 42. Step 8 - Connecting to the monitoring platform. Refer to Setting Up Communication to the Monitoring  Platform  on page 70. Step 9 - System Configuration - Configuring the RS485 bus and StorEdge applications. Refer to System  Configuration on page 80. The following flowchart appears throughout this Installation Guide to assist with the installation steps: StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 15: Installation Equipment List

       Wire cutters    Wire strippers    Voltmeter    For installing the communication options, you may also need the following: For Ethernet:    CAT5/6 twisted pair Ethernet cable with RJ45 connector.   If using a CAT5/6 cable spool: RJ45 plug and RJ45 crimper   For RS485:    Four- or six-wire shielded twisted pair cable.    Watchmaker precision screwdriver set    Inverter Transport and Storage Transport the inverter in its original packaging, facing up and without exposing it to unnecessary shocks.  If the original package is no longer available, use a similar box that can withstand the weight of the  inverter (refer to the inverter weight in the specification datasheet provided with the unit), has a handle  system and can be closed fully. Store the inverter in a dry place where ambient temperatures are -25°C - +65°C / -13°F - 149°F. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 16: Chapter 2: Installing The Power Optimizers

    InterTek) should be obtained, verifying the compatibility of the connectors. IMPORTANT SAFETY FEATURE Modules with SolarEdge power optimizers are safe. They carry only a low safety voltage before the inverter is turned ON. As long as the power optimizers are not connected to the inverter or the inverter is turned OFF, each power optimizer will output a safe voltage of 1V.
  • Page 17: Installation Guidelines

                                     T o allow for heat dissipation, maintain a 2.5 cm / 1" clearance distance between the power optimizer     and other surfaces, on all sides except the mounting bracket side.  Figure 2: Power optimizer clearance NOTE The images contained herein are for illustrative purposes only and may vary depending on product models. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 18: Step 1: Mounting The Power Optimizers

    Images are for illustration purposes only. Refer to the label on the product to identify the plus and minus input and output connectors. For each of the poweroptimizers: Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power     optimizer. Connect the Minus (-) output connector of the module to the Minus (-) input connector of the     power optimizer. Figure 3: Power optimizer connectors 1 Not applicable to smart modules. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 19: Step 3: Connecting Power Optimizers In Strings

    WARNING! If using a dual-input power optimizer and some inputs are not used, seal the unused input connectors with the supplied pair of seals.   Figure 4: Power optimizers connected in series  3.  If you intend to monitor the installation, using the monitoring platform, record the physical location  of each power optimizer, as described in Providing Installation Information on page 48. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 20: Step 4: Verifying Proper Power Optimizer Connection

    To verify proper power optimizer connection: Measure the voltage of each string individually before connecting it to the other strings or to the inverter.  Verify correct polarity by measuring the string polarity with a voltmeter. Use a voltmeter with at least  0.1V measurement accuracy. NOTE Since the inverter is not yet operating, you may measure the string voltage and verify correct polarity on the DC wires inside the Connection Unit. For troubleshooting power optimizer operation problems, refer to Power Optimizer Troubleshooting  on  page 95.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 21: Chapter 3: Installing The Inverter

       One mounting bracket    Two Allen screws for fastening the inverter to the mounting bracket    SolarEdge activation card    One 9V battery    Allen key   f or opening the StorEdge Connection Unit    Installation guide (with activation card and instructions)    Identifying the Inverter Refer to the sticker on the inverter     t hat specifies its Serial Number and its Electrical Ratings.   P rovide the  serial number when contacting SolarEdge support. The serial number is also required when opening a  new site in the SolarEdge monitoring platform. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 22: Inverter Interfaces

    The inverter is being shut down. On - There is an error. Refer to Troubleshooting on page 92 for Fault more information. Blinking - The inverter is being shut down. All LEDs turn on while the inverter is being configured.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 23: Storedge Connection Unit

    StorEdge Connection Unit Figure 6: Inverter front view StorEdge Connection Unit The StorEdge Connection Unit may have either external connections (MC4 connectors and cable glands),  or utilize cable conduits for connections. Figure 7 shows both types. Connections to each of the unit  types are described separately throughout this guide if the connection method is different. Figure 7: StorEdge Connection Unit types The StorEdge Connection Unit with cable glands (Figure 7- left) includes: DC safety switch: disconnects both the positive and negative conductors of the PV and the positive     and negative conductors of the battery. AC output: Cable glands for connection of grid and backed up loads    DC input: Connectors for connection of the PV installation and the battery    Communication and control gland,   f or connection of inverter communication options, meter, ...
  • Page 24: Internal Ac Breaker And Bypass Switch

    Chapter 3: Installing the Inverter Internal AC Breaker and Bypass Switch The following components are part of the StorEdge Connection Unit and may be accessed for  troubleshooting or maintenance by removing the internal cover. Figure 8: StorEdge Connection Unit with and without internal cover Backed-up Loads AC Breaker: Main AC breaker for the backed-up loads. Ensure this breaker is UP     before starting up the system. AC Bypass Switch: This switch bypasses the inverter functionality in case of inverter malfunction.     Maintaining   p ower to the backed-up loads is enabled by connecting the loads directly to the grid.    There are three switch positions. The following table describes the functionality and use of each ...
  • Page 25 CAUTION! SolarEdge inverters can be installed at a minimum distance of 50 m/ 164 ft from the shoreline of an ocean or other saline environment, as long as there are no direct salt water splashes on the inverter.
  • Page 26 Figure 10: Hanging the inverter on the bracket  7.  For inverters with DC Safety Unit -   s ecure the DC Safety Unit bracket to the wall:  8.  Secure the StorEdge Connection Unit bracket to the wall: Mark the location of the bracket screw for the StorEdge Connection Unit and drill the hole.    Fasten the bracket using a standard bolt.    Verify that the bracket is firmly attached to the mounting surface.    Figure 11: StorEdge Connection Unit bracket  9.  Insert the two supplied screws through the outer heat sink fin on both sides of the inverter and into  the bracket (see Figure 10). Tighten the screws with a torque of 4.0 N*m / 2.9 lb.*ft.  10.  Remove the inverter cover: Open the inverter cover’s six Allen screws and carefully pull the cover  horizontally before lowering it. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 27 Mounting the Inverter  11.  Remove the StorEdge Connection Unit covers:   a.  Release the six screws attaching the StorEdge Connection Unit external cover to the enclosure and lift  the cover.  b.  Open the four internal screws securing the transparent cover to the   e nclosure and remove the  cover.   Figure 12: Inverter Covers StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 28: Chapter 3: Installing The Backed-Up Loads Panel And Meter

    Chapter 3: Installing the Backed-up Loads Panel and Meter Chapter 3: Installing the Backed-up Loads Panel and Meter This chapter describes installation of the backed-up loads panel and a meter. Installing the Backed-up Loads Panel Install a secondary AC panel for backed-up loads (not supplied by SolarEdge). Rewire the backed-up     loads through this panel.  Install one pole 25A as the main circuit   b reaker.    Install a residual-current device (RCD) in accordance with the applicable local standards and directives    Figure 13: Backed-up Loads Panel StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 29: Energy Meter Installation

    Energy Meter Installation Energy Meter Installation The StorEdge solution requires connecting a meter   f or   S mart Energy Management applications, such as   maximizing self-consumption. For backup power only, installing a meter is not required. To install the SolarEdge meter, refer to the installation guide supplied with it:  http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide.pdf.   The meter is connected to the inverter using RS485.                 RS485 wiring specifications: Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E STP) may be used)    Wire cross-section area: 0.2-1 mm²/ 24-18 AWG (a CAT5 cable may be used)    NOTE The inverter RS485 bus should be connected to the battery and meter. Connecting multiple inverters with RS485 master-slave connection may require an RS485 Plug- in (available form SolarEdge;...
  • Page 30: Chapter 4: Storedge Inverter Connections

    Chapter 4: StorEdge Inverter Connections Chapter 4: StorEdge Inverter Connections Connect   t he system components to the StorEdge Connection Unit as described in this chapter.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 31 Chapter 4: StorEdge Inverter Connections The following figures show the connections in the StorEdge Connection Unit:   Figure 14: The StorEdge Connection Unit (with glands) connections Figure 15: The StorEdge Connection Unit (with glands) connectors Figure 16: The StorEdge Connection Unit (with conduit entries) connections StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 32: Installing The 9V Battery And Fuses

    Chapter 4: StorEdge Inverter Connections Installing the 9V Battery and Fuses A 9V battery is supplied with the inverter accessories. Install the 9V battery in the holder on the top board  of the StorEdge Connection Unit and connect it to the battery pad. Figure 17: The battery holder Two 25A fuses are supplied with the high power inverters. Install the fuses in the holders on the top board  of the StorEdge Connection Unit . Figure 18: StorEdge Connection Unit fuses StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 33: Connecting The Strings To The Inverter - Storedge Connection Unit With Glands

    NOTE SolarEdge’s fixed input voltage architecture enables the parallel strings to be of different lengths. Therefore, they do not need to have the same number of power optimizers, as long as the length of each string is within the permitted range.
  • Page 34 Chapter 4: StorEdge Inverter Connections  4.  Connect the DC wires from the PV installation to the DC+ and DC- terminal blocks, according to the  labels on the terminals:   a.  Insert a flat blade screwdriver into the square opening at the top of the terminal block   a nd press  to open clamp mechanism.   b.  Insert the wire into the round opening and release   t he screwdriver to spring back and clamp the  wire. Check that the wire is fully inserted and cannot be pulled out easily. CAUTION! Ensure that the Plus (+) wire(s) is connected to the (+) terminal and that the Minus (-) wire is connected to the Minus (-) terminal connector.
  • Page 35: Connecting To The Battery

    Be sure to adhere to all safety cautions and information in the battery documentation.     The battery   c onnects to the DC side of the inverter. Since the inverter DC connections are on its left     side, it is recommended to position the battery   t o the left of the inverter to simplify wiring. WARNING! The battery should be powered OFF before and during wiring. Turn OFF:  a.  The circuit breaker switch  b.  The auxiliary power supply switch To reconnect power, turn ON:  a.  The auxiliary power supply switch  b.  The circuit breaker switch     StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 36 Chapter 4: StorEdge Inverter Connections The following table and figures   d etail cable types and connections of one battery (LG Chem RESU7/  RESU10). Prepare cables and connect as described in the following table : StorEdge LG Chem Recommended cable type Connection Connection method to the battery (min-max cross section) Unit StorEdge Connection Unit connection connection Inverter with MC4 connectors (Figure 14): Connect to the BAT IN connectors.
  • Page 37 Connecting to the Battery Figure 21: Connections to LG Chem RESU7H/ RESU10H battery (StorEdge Connection Unit with glands and two DIP-switches)   SolarEdge-StorEdge Inverter Installation Guide MAN-01-00390-1.0262-1.3496-1.0...
  • Page 38 Connecting to the Battery Figure 22: Connections to LG Chem RESU7H/ RESU10H battery (StorEdge Connection Unit with glands and three DIP-switches)   SolarEdge-StorEdge Inverter Installation Guide MAN-01-00390-1.0262-1.3496-1.0...
  • Page 39: Dip Switch Setup

    (see also Creating an RS485 Bus Connection on page 76) StorEdge Connection Unit Two or three DIP switches - All in Up (Figure 25) position 1 For installing an external 120 Ohm termination plug, contact SolarEdge Support . StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 40 Chapter 4: StorEdge Inverter Connections Figure 23: RS485 termination switch on the inverter communication board   Figure 24: SolarEdge Meter DIP Switches Figure 25: StorEdge Connection Unit DIP switches StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 41: Connecting Communication To The Meter

    RS485 0.2 mm (0.2 - 1.5 mm Ext. Devices 7-pin terminal shielded twisted pair, 600V RS485 4-pin terminal block: B, A, G block: B, A, G insulated Insert the cable from the meter through the communication gland (labeled 1). Connect as illustrated below: Figure 26: Connection to a meter StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 42: Battery Grounding

    Chapter 4: StorEdge Inverter Connections Battery Grounding You can connect battery grounding cable either to local ground or to the inverter grounding terminal on  the AC side. If connecting to the inverter, follow the procedures herein. To connect grounding to the inverter:  1.  If not removed, remove the StorEdge Connection Unit internal cover .  2.  Insert the grounding cable through one of the openings at the AC side.  3.  Connect the cable to the terminal block labeled  in the StorEdge Connection Unit. Figure 27: Grounding the battery StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 43: Connecting To The Ac Grid And To Backed-Up Loads

    If there are multiple inverters in the installation, each inverter should be connected to a separate backed-up loads panel. Do not share backup output between inverters.   NOTE StorEdge inverters require neutral connection at all times (only grids with neutral connection are supported). To prepare the AC cables:  1.  Turn OFF the AC before connecting the AC terminals. ...
  • Page 44 Chapter 4: StorEdge Inverter Connections Figure 29: Connection to grid and backed-up loads (StorEdge Connection Unit with glands) To connect the AC cables - StorEdge Connection Unit with conduits: NOTE For Australia: Use 10mm wire to connect the inverter to ground.
  • Page 45: Chapter 5: Commissioning The Installation

    This message is displayed until the DC voltage is safe (50V). Do not open the cover until the voltage is safe or until at least five minutes have passed.  2.  Turn the Connection Unit (if applicable) to OFF.  3.  Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.   4.  Open the inverter cover’s six Allen screws and carefully pull the cover horizontally before lowering it. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 46: Step 1: Activating The System

    Chapter 5: Commissioning the Installation CAUTION! When removing the cover, make sure not to damage the internal components. SolarEdge will not be held responsible for any components damaged as a result of incautious cover removal. Step 1: Activating the System  1. ...
  • Page 47  Platform  on page 70. StorEdge application configuration - refer to System Configuration on page 80.     7.  Close the inverter cover   b y tightening the screws with a torque of 9.0 N*m/ 6.6 lb*ft. For proper  sealing, first tighten the corner screws and then the two central screws. The following figure  illustrates recommended order: Figure 32: Tightening order of the screws  8.  Close the StorEdge Connection Unit internal cover: Attach the cover and secure it by tightening the  four screws with a torque of 1.2 N*m / 0.9 ft.*lb.   9.  Make sure the AC Bypass switch in the StorEdge Connection Unit is switched to the left (position 1).  10.  Make sure the backed-up loads AC breaker   i n the StorEdge Connection Unit is UP.  Figure 33: StorEdge Connection Unit  11.  Close the StorEdge Connection Unit external cover: Attach the cover and secure it by tightening the  six screws with a torque of 1.2 N*m / 0.9 ft.*lb.  StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 48    the inverter is connected to the server). Vac [V]: The grid AC output voltage. Verify the correct value.     Vdc [V]: The DC input voltage of the longest string connected to the inverter.   T here should be a     safety voltage of 1V for each power optimizer in the string. NOTE A measurement error on the inverter LCD of ±3 V is acceptable.   Pac [w]: The AC output power (should be 0.0 since the inverter is OFF).     OFF: The inverter ON/OFF switch is in the OFF position.     StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 49: Step 2: Pairing Power Optimizers To The Inverter

    1V output. When the inverter starts converting power after the initial connection to the AC, the inverter enters  Wakeup mode until its working voltage is reached. This mode is indicated by the flickering green inverter  LED. While the inverter is in Wakeup mode, it monitors the grid and verifies correct grid voltage and frequency.  The following message is displayed: W a k i n g U p . . . R e m a i n i n g : 0 5 1 S e c StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 50: Step 3: Verifying Proper Activation

    The green inverter LED is steadily lit.    The ON/OFF indicator on the LCD panel reads ON.    P_OK: XXX/YYY:   T here is a connection to the power optimizers and at least one power optimizer is     sending monitoring data. Optimizers send telemetries in a frequency of up to 10 minutes. S_OK appears, if the inverter is connected to the SolarEdge monitoring platform.     Vac [V] specifies the measured grid AC output voltage.     Vdc [v] specifies the DC input voltage, which should be approximately the inverter DC voltage (model     dependent; refer to the inverter datasheet) Pac [W] specifies the AC output power produced.     2.  Take note of the serial number on the inverter label using the detachable 2D barcode sticker on each  device. This information is used in the SolarEdge monitoring platform to identify this inverter. Your SolarEdge power harvesting system is now operational. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 51: Step 4: Reporting And Monitoring Installation Data

    View the latest performance of specific components.  Find under-performing components, such as modules, by comparing their performance to that of   other components of the same type. Pinpoint the location of alerted components using the physical layout.  See how components are connected to each other.  Pair power optimizers remotely.  To display a logical layout, insert the inverter  serial number in the new site created in the application.  When the communication between the inverter and the monitoring server is established, the logical  layout is displayed. To display a physical layout, you need to map the locations of the installed power optimizers. To generate  a physical mapping, use either the Site Mapper application or the physical layout editor in the monitoring  platform. The logical and physical mapping can be used for debugging a problem using the   m onitoring platform. If you do not report the physical and logical mapping of the installed power optimizers to SolarEdge, the   monitoring platform will show the logical layout indicating which power optimizers are connected to  which inverter, but will not show strings or the physical location of power optimizers . The inverter may be connected to the   m onitoring platform via LAN or by using a   Z igBee Gateway system  or a   C ellular Plug-in. Alternatively, you can use RS485 chain (bus) connection to connect   m ultiple  SolarEdge devices to one inverter that is already connected to the server, in a master/slave configuration.  Refer to Setting Up Communication to the Monitoring Platform  on page 70 . StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 52: Providing Installation Information

    For detailed information, refer to the Mapper demo movies: Creating new sites using the Mapper mobile application    Mapping power optimizers using the Mapper mobile application  iPhone Use the Mapper smartphone application to scan the power optimizer and inverter 2D bar-codes. This  application creates an XML file that can be uploaded to the   m onitoring platform during site registration.  The Mapper can be downloaded from the application stores. For detailed information, refer to the Mapper Software Guide or to the Site Mapper demo  movie, available on the SolarEdge website at  http://www.solaredge.com/groups/installer-tools/site-mapper. Creating a Site in the Monitoring Platform Create the site in the monitoring platform using the registration form available at   https://monitoring.solaredge.com/solaredge-web/p/login. Fill out all required  information in the form, which includes information about your installation, as well as  details about its logical and physical mapping. Paper Template Fill out the Physical Layout Template (downloadable from the SolarEdge site) using the  detachable 2D barcode stickers on each power optimizer. Once the form is completed,  scan it and upload the scanned file to the   m onitoring platform during site registration.  For an example paper template, refer to http://www.solaredge.com/files/pdfs/physical- layout-template.pdf. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 53: Chapter 6: User Interface

       menu, and cancels a value change with a long press (until Aborted is displayed). Up (1) and Down (2): Moves the cursor from one menu option to another, moves among the     characters of a displayed parameter, and toggles between possible characters when setting a value. : Selects a menu option and accepts a value change with a long press (until Applied is displayed).    The LCD screen displays status information of the system and various menus for configuration options.  The LCD panel and buttons are used during the following processes: Operational mode: The LCD panel allows checking for proper system   o peration. Refer to Status     Screens - Operational Mode on page 63 for a description of this option. Setup mode: Upon installation, an installer may perform basic configuration .    Error messages: In the event of a problem, an error message may be displayed on the LCD panel.     For more information, refer to http://www.solaredge.com/sites/default/files/se- inverter-installation-guide-error-codes.pdf and Inverter   C onfiguration – Setup Mode on  page 51. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 54: Inverter Configuration - Setup Mode

    D i s p l a y M a i n t e n a n c e I n f o r m a t i o n The   i nverter is now in Setup mode and all its LEDs are lit. The   i nverter automatically exits Setup mode if no  buttons are pressed for more than 2 minutes.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 55 C o n f < M T R >   1 If ZigBee is connected, the Wi-Fi Conf menu is not displayed. If ZigBee is not connected, ZigBee Conf and Wi-Fi Conf are both displayed with <N/A>. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 56 V e r s i o n s E r r o r L o g W a r n i n g l o g H a r d w a r e I D s StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 57: Configuring The Inverter Using The Lcd Light Button

    C o m m u n i c a t i o n M a i n t e n a n c e I n f o r m a t i o n E x i t  3.  Short-press (one second) to scroll down to the next menu option, and long-press (three seconds) to  select the item. You can use the Exit option in these menus to move up one menu level or to exit the  Setup mode from the main menu.    StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 58 W a r n i n g l o g H a r d w a r e I D s E x i t   1 If Wi-Fi is connected, the ZigBee Conf menu is not displayed, and vice versa. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 59 G r i d P r o t e c t i o n B o a r d R e p l a c e m e n t E x i t The options presented in these menus are described in the next section. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 60: Configuration Menu Options

     monitoring platform  The communication option used to communicate between multiple   S olarEdge devices or     other external non-SolarEdge devices, such as electricity meters or loggers.  2.  Select Server to set which communication method is used to communicate between   d evices and the  SolarEdge monitoring platform. Refer to Setting Up Communication to the Monitoring Platform  on page  70 for a full description of these communication options. NOTE The Server menu shows only the communication options installed in the inverter. The following shows a hierarchical tree of the menu options in the Communication menu.  For detailed information about all the configuration options, refer to the Communication  Options Application Note, available on the SolarEdge website at  http://www.solaredge.com/files/pdfs/solaredge-communication_options_application_ note_v2_250_and_above.pdf.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 61 1 If ZigBee is connected, the Wi-Fi Conf menu is not displayed. If ZigBee is not connected, ZigBee Conf and Wi-Fi Conf are both displayed with <N/A> and their menus are not accessible. 2 When using the SolarEdge GSM products, RS232 Conf menu is unavailable. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 62: Power Control

    A d v a n c e d L o a d D e f a u l t s   Power control options are detailed in the Power Control Application Note, available on the SolarEdge  website at http://www.solaredge.com/files/pdfs/application_note_power_control_configuration.pdf. The Grid Control option may be disabled. Enabling it opens additional options in the  menu. 1 When using the SolarEdge GSM products this menu is unavailable. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 63   For P(Q) diagram refer to https://www.solaredge.com/sites/default/files/application_ note_p_q_diagram_of_se_inverters_en_and_na.pdf NOTE SolarEdge inverters with “Grid Support” functionality (as marked on the inverter certification label), are compliant with UL 1741 Supplement A. The functionality is built into the inverter and no additional external device is required.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 64: Display

    Factory Reset: Performs a general reset to the   d efault device settings.    FW Upgrade: Perform a software upgrade   b y using an SD card. Refer to upgrading_    an_inverter_using_micro_sd_card.pdf. Diagnostics: Displays the Isolation Status and optimizers status screens. Refer to     www.solaredge.com/files/pdfs/application_note_isolation_fault_ troubleshooting.pdf . Standby Mode: Enables/disables Standby Mode - for remote commissioning.    Grid Protection: Available in specific countries. Enables viewing and setting grid protection values.     Optimizer Conf.: Opens   t he Rapid Shutdown menu, to enable/disable PVRSS.    Board Replacement: Backs up the system parameters; Used during board replacement according to     the instructions supplied with replacement kits.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 65: Information

    I D s Versions: Displays inverter firmware versions:    ID: The inverter ID.   DSP 1/2: The DSP digital control board firmware version   CPU: The communication board firmware version   NOTE Please have these numbers ready when you contact SolarEdge Support. Error Log: Displays the last five errors.    Warning Log: Displays the last five warnings.    Hardware IDs: Displays the following HW serial numbers (if exist, and connected to the inverter):      ID:   t he inverter's ID   ...
  • Page 66: Status Screens - Operational Mode

    < O K / E r r o r # > P o w e r [ W ] : x x x x x . x E n e r g y [ W h ] : X X X X X . X StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 67: Telemetry Status

    D S P 1 / 2 : 1 . 0 2 1 0 / 1 . 0 0 3 4 C P U : 0 0 0 3 . 1 9 x x C o u n t r y : E S P ID: The inverter ID.    DSP 1/2: The DSP digital control board firmware version    StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 68: Server Communication Status

    R S S I : < L > M I D : X X X X RSSI: The receive signal strength indication of the closest ZigBee in the system. L = low, M = medium, H     = high and (-) = no signal. PAN ID: The ZigBee transceiver PAN ID (Personal Area Network Identification), the ID uniquely     represents a device in a Zigbee network. Ch.: The ZigBee transceiver channel    ID: The ZigBee transceiver ID    MID: The Master ID of the coordinator (master) ZigBee Plug-in. This field is shown only in devices with     router (slave) ZigBee cards, and after a successful ZigBee association. If a ZigBee Plug-in is not  connected, a No ZigBee message is displayed instead of the MID field. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 69: Wi-Fi Status

    < - - > Z i g B e e < S E > < M P S > < - - > ##: The total number of slaves detected on the specific port    Dev: The type of device that was configured to a specific port (based on the port’s functionality), as     follows: SE: SolarEdge device (default)   LGR: Non-SolarEdge logger   MLT: Multiple devices, such as meters and batteries   HA: Home automation devices (for Smart Energy)   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 70: Smart Energy Management Status

    ZigBee protocol S: SolarEdge slave M: SolarEdge master P2P: ZigBee point-to-point MPM: ZigBee multipoint master (for the SolarEdge ZigBee home gateway or for load management by the inverter) MPS: ZigBee multipoint slave (for a ZigBee router card) For electricity meters,   r efer to the application note - Connecting an Electricity Meter ...
  • Page 71: Battery Status

    < x > W h S t a t e : C h a r g i n g BSN: Battery serial number    ID: Battery identification - should be 24 as set up above    SOE: State of Energy - the battery capacity percentage (calculated as Available Energy\Max. Energy)    PWR: The charging or discharging power (in Watts) according to the battery state (see below)    Total: The total discharged energy in Watt/hour    State: The battery status: Charging/ Discharging, Idle, Init (pre-heating) or Fault <error code>.      StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 72: Charge/ Discharge Profile Programming Status

    < R e m o t e > S e t U n t i l : < d a t e > Name: The TOU profile file name     Last Sync: Date when the time-of-use profile was loaded from the monitoring platform    Source: the source from which the TOU profile was uploaded:     Remote - Profile uploaded from the SolarEdge monitoring platform   Local - Profile uploaded from an SD card   Set Until: The date until the current profiles applicable    StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 73: Chapter 7: Setting Up Communication To The Monitoring Platform

    Chapter 7: Setting Up Communication to the Monitoring Platform Chapter 7: Setting Up Communication to the Monitoring Platform The inverter sends the following information to the monitoring platform: Power optimizer information received via the DC power lines (the PV output circuit)    Inverter information     Information of any other connected devices      This chapter describes setting up communication between:  the inverter and the monitoring platform through the Internet (wired/ wireless), or through a cellular     connection multiple inverters   f or a master/slave configuration    Communication setup is not required for power harvesting, however it is needed for using the  monitoring platform.   CAUTION! StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 74: Communication Options

       RS485 Plug-in: The RS485 Plug-in provides an additional RS485 port for the     inverter for enhanced communications. The kit contains a module, which is  installed on the communication board, and has a 3-pin RS485 terminal block.  This kit is provided with an installation guide, which should be reviewed prior to  connection see,   h ttps://www.solaredge.com/sites/default/files/RS485_ expansion_kit_installation_guide.pdf  For connection instructions refer to Creating an RS485 Bus Connection on page 76. Wi-Fi This communication option enables using a Wi-Fi connection for connecting   t o the   monitoring platform.  The Wi-Fi station is built into the inverter. An antenna is required and available from  SolarEdge for connection to the monitoring platform. The Wi-Fi option requires a Wi-Fi Plug-in and an external antenna, available from  SolarEdge in a kit, which can be purchased separately and assembled during system  installation. The Wi-Fi Plug-in kit is provided with a user manual, which should be reviewed prior to  connection. Refer to http://www.solaredge.com/sites/default/files/se_wifi_communication_solution_ installation_guide.pdf Cellular This wireless communication option   ( purchased separately) enables using a cellular  connection to connect one or several devices (depending on the data plan used) to the   monitoring platform.   The GSM Plug-in is provided with a user manual, which should be reviewed prior to  connection. Refer to https://www.solaredge.com/sites/default/files/cellular_gsm_ installation_guide.pdf   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 75: Zigbee

    External antenna cable 2-4 mm 1 (PG16) Ethernet connection (CAT5/6), Two large 4.5-7 mm ZigBee, or Wi-Fi 2 (PG13.5) All three RS485, power reduction 2.5-5 mm   Figure 35: Communication Glands The communication board has a standard RJ45 terminal block for Ethernet connection, and a 9-pin  terminal block for RS485 connection,   a s shown below: StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 76 Chapter 7: Setting Up Communication to the Monitoring Platform Figure 36: Internal connectors StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 77: Creating An Ethernet (Lan) Connection

    To connect the Ethernet cable:  1. Remove the inverter cover .  2. Open the communication gland #1. CAUTION! The gland includes a rubber waterproof fitting, which should be used to ensure proper sealing.  3. Remove the plastic seal from one of the large opening   .  4. Remove the rubber fitting from the gland and insert the CAT5/6 cable through the gland and through the gland opening in the inverter .  5. Push the cable into the cut opening of the rubber fitting. Figure 38: Rubber fitting StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 78  a. Insert the cable through gland #1.  b. Remove the cable’s external insulation using a crimping tool or cable cutter and expose eight wires.  c. Insert the eight wires into an RJ45 connector, as described in Figure 39.  d. Use a crimping tool to crimp the connector.  e. Connect the Ethernet connector to the RJ45 port on the communication board. Figure 40: The RJ45 Ethernet connection 1 The inverter connection does not support RX/TX polarity change. Supporting crossover Ethernet cables depends on the switch capabilities. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 79: Creating An Rs485 Bus Connection

    If not using surge protection, connect the grounding wire to the first inverter in the RS485 chain; make sure the grounding wire is not in contact with other wires. For inverters with a StorEdge Connection Unit, connect the grounding wire to the grounding bus-bar in the StorEdge Connection Unit.
  • Page 80 Chapter 7: Setting Up Communication to the Monitoring Platform NOTE An additional RS485 port (RS485-Plug-in) is available from SolarEdge, allowing configuration of multiple RS485 buses for communications in large sites; Refer to http://www.solaredge.com/files/pdfs/RS485_expansion_kit_installation_guide.pdf). The following sections describe how to physically connect the RS485 bus and how to configure the bus. To connect the RS485 communication bus:  1. ...
  • Page 81   Figure 44: RS485 termination switch NOTE Only the first and last SolarEdge devices in the chain should be terminated. The other inverters in the chain should have the termination switch OFF (down position).  11.  If not using surge protection, connect the grounding wire to the first inverter in the RS485 chain;  make sure the grounding wire is not in contact with other wires. For inverters with a StorEdge  Connection Unit, connect the grounding wire to the grounding bus-bar in the StorEdge Connection ...
  • Page 82: Verifying The Connection

    P _ O K : 0 0 0 / 0 0 0 < S _ O K > - - - - - - - - - - - - - - - O F F S_OK: Indicates that the connection to the SolarEdge monitoring platform is successful. If S_OK is not  displayed, refer to "Troubleshooting" on page 92. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 83: Chapter 8: System Configuration

    Chapter 8: System Configuration This chapter describes how to configure your StorEdge system by setting up the communication  between the system components and setting up the required   a pplication. To use the StorEdge  applications, the communication board firmware (CPU) version must be 3.xxxx and later on all SolarEdge  inverters at the same site . The latest firmware version is available for download at  http://solaredge.com/storedge/firmware. Upgrading the Inverter Firmware Version Upgrade the inverter firmware using a MicroSD card with the latest firmware version downloaded from  the above link . To upgrade the inverter firmware:  1.  Make sure that:  The inverter has been activated using the activation card supplied with the inverter    The inverter ON/OFF switch is OFF    The AC voltage to the inverter is OFF     2.  Remove the inverter cover. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 84: Configuring The Rs485 Bus For Battery And Meter Connection

    < - - - > M e t e r < - - - > B a t t e r y < - - - > B a t t e r y < - - - > StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 85 < 1 5 > B a t t e r y I n f o < >  7.  Select Device Type  Battery Pack.  8.  Select the battery protocol and ID(s):  Battery type Protocol Default Device ID LG Chem RESU7/ RESU10 LG Battery StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 86 8 9 % P W R : T o t a l : < x > W h S t a t e : C h a r g i n g If Comm. Error appears, refer to Communication   T roubleshooting on page 92.   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 87: Configuring Storedge Applications

    M a i n t e n a n c e I n f o r m a t i o n  2.  From the main menu select Backup Conf. B a c k u p < D i s >  3.  Select Backup  Enable.  StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 88 S e l f - c o n s u m e T i m e U s e B a c k u p O n l y D i s a b l e Max Self-consume (MSC): Maximize Self-consumption  Time of Use (TOU): Charge/Discharge Profile Programming Backup Only: Supply power to loads during power outage Disable: No energy control, that is, the battery is not used   StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 89: Setting Backup-Only

    A l w a y s A l w a y s O F F  c.  Select one of the options: Select Always OFF to avoid battery usage entirely (for example during winter)    Set Start Time and End Time to set battery usage in specific hours and avoid usage during     specific hours throughout the month (for example at night). This sets the periods during  which the battery will be in the OFF state. Select Always ON to use battery at all times for charging/ discharging.     4.  To set a minimum battery level used for backup, so that the battery will always have energy stored in  case backup power is needed, do the following:  StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 90: Setting Charge/ Discharge Profile + Backup Power

    S e r v e r S y n c < D i s > L o a d < N / A >  4.  Do one of the following: To load a time-of-use table from the monitoring platform, refer to     https://www.solaredge.com/sites/default/files/storedge_charge_discharge_ profile_programming.pdf . To load a time-of-use table from the SolarEdge SD card (contact SolarEdge to     obtain it), insert the card to the slot labeled "Card" on the communication board  and select Load SD. From the displayed list select the directory and the table  (filename). StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 91: Verifying Storedge Components Functionality

    2. Turn the inverter ON/OFF switch to ON. 3. Make sure the Connection Unit is ON. 4. Enter Setup mode and select Maintenance StorEdge Self-TestStart Test. The battery charges and discharges within approximately two minutes to check performance. During the test, the following message is displayed:...
  • Page 92 P _ O K : X X X / Y Y Y < S _ O K > ....StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 93 W W W W W P W R : T o t a l : < X > W h S t a t e : D i s c h a r g i n g StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 94 S O E : 8 9 % W W W W W P W R : T o t a l : < x > W h S t a t e : C h a r g i n g StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 95: Appendix A: Troubleshooting

    LED at the router /switch is lit (indicating Gateway Ping Failed phy-link). If OK - contact your network IT, otherwise replace the cable or change it from cross to straight connection. Ping to google.com failed. Connect a laptop G Server Ping Failed StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 96: Meter Troubleshooting

    AP/router.For Wi-Fi networks, ensure that username and password are as defined in the internet provider AP/router. Ping or connection to SolarEdge server failed. Check the SolarEdge server address, under LAN Conf submenu: Server x Ping Failed Address: prod.solaredge.com...
  • Page 97: Battery Troubleshooting

    B a t t e r y I n t e r n a l F a u l t < # > ( I D : 1 5 ) < x x x x > Fault # - according to battery ID - The Modbus ID of the battery <xxx> - text StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 98: Power Optimizer Troubleshooting

    (not applicable to smart modules). String voltage not 0V but lower than number of optimizers Connect the modules to the optimizer inputs String reverse polarity. Check string polarity using a voltmeter and correct if needed. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 99 Contact SolarEdge Support. Do not continue before finding the problem and replacing the malfunctioning power optimizer. If a malfunction cannot be bypassed or resolved, skip the malfunctioning power optimizer, thus connecting a shorter string. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 100: Storedge Connection Unit Leds

    Appendix A: Troubleshooting StorEdge Connection Unit LEDs There are three LEDs on the lower board of the StorEdge Connection Unit, near the DIP switches:  Figure 47: StorEdge Connection Unit LEDs In normal operation, the middle and bottom LEDs indicate auxiliary voltages (13V from DC/DC, 5V and     3.3V) and should always be   l it.   The top LED should be lit when the inverter DC voltage is at least 200 Vdc (check when both inverter     ON/OFF switch and StorEdge Connection Unit switch are ON). You can check the status screen for  the Vdc value. If all LEDs are OFF:     Check that AC voltage exists in the inverter   Check that the communication cable between the StorEdge Connection Unit and the digital    board is properly connected. If the top LED is ON, and middle and bottom LEDs are off - an internal failure has occurred. Contact     SolarEdge support. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 101: Additional Storedge Troubleshooting

    Check that the AC circuit breaker in Internal circuit breaker has been the StorEdge Connection Unit is in the triggered UP position (see Figure 8) During normal operation (grid supplies power), no power to the...
  • Page 102 StorEdge Connection Unit are in the UP position (see Figure 8) Check that the AC bypass switch in the StorEdge Connection Unit is set to position 1 (see Figure 8) . A battery internal fault is displayed Fault # –according to battery...
  • Page 103: Storedge-Related Errors Codes

    Shutdown non-essential loads to reduce power consumption. Check all the communication cable between Connection Unit 2xB5 the StorEdge Connection Unit and the digital HW Error board in the inverter. There is a faulty wire connection or an internal error. Check the communication cable between...
  • Page 104: System Warnings

    8x6A - 8x6F Appears when trying to access the Setup Turn Switch Off to Configure menus during production Replace the 9V battery in the StorEdge 2x111 Connection Unit Low 9V Battery Connection Unit. Refer to 9V Battery Replacement on page 104.
  • Page 105: Appendix B: Opening Conduit Drill Guides

    To open conduit drill guides:  1.  Move the StorEdge Connection Unit   s afety switch   a nd the inverter ON/OFF switch to OFF. NOTE When the StorEdge Connection Unit safety switch is OFF (for example during maintenance) it may be locked to prevent a safety hazard: 1. Move the switch to the Lock position.
  • Page 106 Appendix B: Opening Conduit Drill Guides Figure 49: StorEdge Connection UnitDC Safety Unit drill guides NOTE Unused conduit openings and glands should be sealed with appropriate seals. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 107: Appendix C: Replacing And Adding System Components

    If Warning 8: Connection Unit Low 9V Battery is displayed in the main status screen, replace the 9V  battery in the StorEdge Connection Unit.  1.  Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe  (<50V), or wait five minutes before continuing to the next step. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five minutes for the input capacitors of the inverter to discharge. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 108 Appendix C: Replacing and Adding System Components  2.  Turn OFF the StorEdge Connection Unit and the AC switch of the distribution panel.   3.  Open and remove the StorEdge Connection Unit cover.  4.  Open and remove the transparent internal cover.  5.  Remove the battery from the upper board of the StorEdge Connection Unit and replace with a new  standard 9V battery.  6.  Close the StorEdge Connection Unit covers. Figure 50: The battery holder StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 109: Fuse Replacement

     2.  Turn OFF the StorEdge Connection Unit  and the AC switch of the distribution panel.   3.  Open and remove the StorEdge Connection Unit  cover.  4.  For StorEdge Connection Unit - Open and remove the internal transparent cover.  5.  Remove the faulty fuse from the upper board of the StorEdge Connection Unit   a nd replace with a  new fuse.  6.  Close the StorEdge Connection Unit   c over(s). Figure 51: StorEdge Connection Unit fuses Battery Replacement To disconnect or replace a battery:  1.  Turn OFF the StorEdge Connection Unit ON/OFF switch.  2.  Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe  (<50V), or wait five minutes before continuing to the next step. WARNING! If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five minutes for the input capacitors of the inverter to discharge.
  • Page 110 Appendix C: Replacing and Adding System Components  4.  On LG Chem batteries - turn OFF the auxiliary power switch and the circuit breaker switch.  Figure 52: LG Chem switches  5.  Use a multimeter to verify that DC voltage is below 50V   a t the battery connection.  6.  Disconnect the cables from the battery side and replace the battery.  7.  Connect the battery to the system as described in Connecting to the Battery on page 32. StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 111: Appendix D: Mechanical Specifications

    Appendix D: Mechanical Specifications Appendix D: Mechanical Specifications Inverter Dimensions Figure 53: Inverter dimensions - StorEdge Connection Unit with glands StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 112 Appendix D: Mechanical Specifications Figure 54: Inverter dimensions - StorEdge Connection Unit with conduit openings StorEdge Inverter Installation Guide MAN-01-00390-1.1...
  • Page 113: Storedge Inverter For High Power Technical Specifications

    StorEdge Inverter for High Power Technical Specifications StorEdge Inverter for High Power Technical Specifications SE5000-xxS2 SE6000-xxS2 Unit OUTPUT - AC (LOADS/GRID) Rated AC Power Output 5000 6000 Max AC Power Output 5000 6000 AC Output Voltage (Nominal) 220 / 230 AC Output Voltage Range 184 - 264.5...
  • Page 114 StorEdge Inverter for High Power Technical Specifications SE5000-xxS2 SE6000-xxS2 Unit Reverse-Polarity Protection Ground-Fault Isolation Detection 600kΩ Sensitivity Maximum Inverter Efficiency 97.6 European Weighted Efficiency 97.4 INPUT - DC (PV) Maximum DC Power (STC) 6750 8100 Max Input Current 19.5 2-pole Disconnection...
  • Page 115 StorEdge Inverter for High Power Technical Specifications SE5000-xxS2 SE6000-xxS2 Unit StorEdge Connection Unit with Conduit Openings AC Output (Loads/Grid) conduit size / wire cross mm(in) / 32 (1) / 2-14 section AC Output (Backup) conduit size / wire cross mm(in) /...

Table of Contents