Chapter 6: Setting Up Communication - SolarEdge SE50K Installation Manual

Extended power commercial inverter
Hide thumbs Also See for SE50K:
Table of Contents

Advertisement

Chapter 6: Setting Up Communication

Chapter 6: Setting Up Communication
The inverter sends the following information to the monitoring platform:
 
Power optimizer information received via the DC power lines (the PV output circuit)
l
 
Inverter information 
l
 
Information of any other connected devices
l
 
This chapter describes setting up communication between: 
 
the inverter and the monitoring platform through the Internet (wired/ wireless), or through a cellular 
l
connection
 
multiple inverters   f or a master/slave configuration
l
Communication setup is not required for power harvesting, however it is needed for using the SolarEdge 
monitoring platform.
NOTE
It is recommended to connect communication connections before connecting the AC, for easier
access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P switch at the bottom of
the inverter is turned OFF, and the AC is turned OFF.
 
When configuring the communication parameters, make sure that the ON/OFF/P switch is in P
position, and the AC is turned ON.
When connecting the communication cables, make sure that the ON/OFF/P switch on the Connection
Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch on the
Connection Unit is OFF, and the AC is turned ON.
52
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se82.8kSe55kSe100kSe66.6k

Table of Contents