Inverter Energy Status

Inverter Energy Status
Displays the total energy produced during the last day, month, year and since inverter installation.
Inverter Energy
Today
45 kWh
Total: 41.03 MWh
 
Today: since midnight
l
 
This Month: since 1st of the current month 
l
 
This Year: since January 1st
l
 
Total (Wh): The inverter total energy. If an external meter is installed, the value displayed in this line 
l
depends on the meter type connected to the inverter and its location:
 
If a bidirectional meter is connected at the consumption point, this value is the consumed energy.
o
 
If the meter is installed at the production point, this value is the energy produced by the site.
o
 
If the meter is installed at the grid connection point, this value is the energy exported to the grid.
o

Meter Status

Production – RS485-2 Modbus ID #2
Power: 7.60kW, Energy: 13.68MWh
Export – GPIO S0 meter
1000 pulses per kWh
Power: 7.60kW, Energy: 13.68MWh
 
Type and function: Displays the meter functionality (Production, Export, Import, Export+Import)
l
 
Status: Displays OK if the meter is communicating with the inverter
l
 
<Error message>: If there is a meter error, it is displayed in this line. 
l
 
Power: Depending on the meter type connected to the inverter, this line displays the exported or 
l
imported power
50
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
This Month
This Year
1.14 MWh
13.68 MWh
Meters
Status: OK