Secondary Grounding

 3.  Strip the required length of the external and internal cables insulation. 
 
 4.  Open the AC cable gland and insert the cable through the AC gland.
WARNING!
Turn OFF the AC before connecting the AC terminals. If connecting equipment grounding wire,
connect it before connecting the AC Line and Neutral wires.
 5.  If using a separate wire / cable for grounding , insert the additional wire/ cable for grounding through 
the PE gland.
 
Strip the required length of the external and internal cables insulation.
l
 
Open the PE cable gland and insert the cable through the PE gland.
l
 6.  Connect the grounding wire to the grounding terminal block and tighten with a torque   o f 
15N*m / 12 lb*ft.
 7.  Remove the screws from the AC terminal blocks.
 8.  Crimp ring terminals on the AC wires. The ring terminals width is maximum 24 mm. 
 9.  Connect the wires to the terminal blocks with a proper tool according to the labels on the terminals. 
 10.  Tighten the screws of each terminal with a torque of 2.0 N*M /   1 8 lb-in
Wire type
Line 1
Line 2
Line 3
Neutral
Secondary Grounding
If required, ground the units as described in the following figure using a grounding cable, a grounding 
screw,two washers, a ring terminal and a serrated washer. You can connect the grounding cable to 
either side of a unit and to either the mounting hole or grounding screw. You can connect grounding to 
the Primary Unit and to each of the Secondary Units, as required.
 
30
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
Figure 19: Insulation stripping – AC
Connect to terminal
L1
 
L2
 
L3
 
N
Figure 20: Wire connections to terminal block