Mounting and Connecting the Primary and Secondary Unit(s)
Location
Locations where the annual
average high temperature
below 25˚C / 77˚F
Locations where the annual
average high temperature
above 25˚C / 77˚F
 3.  Position the mounting brackets against the wall and mark the required drilling holes locations with 
the supplied level.
The level markings correspond to a distance of 3cm between units. 
 4.  Drill two holes for each bracket and mount the brackets.
 5.  Put in the screws without tightening in order to correct positioning.
 6.  Place the level beneath the brackets   a nd align the brackets, tighten the screws all the way and verify 
that the brackets are firmly attached to the mounting surface. 
 7.  Mount the Primary Unit:
 
Lift the Primary Unit from its sides. 
l
 
Align the two indentations in the   e nclosure with the two triangular mounting tabs of the bracket, 
l
and lower the unit until it rests on the bracket evenly (see Figure 14).
 
Insert the supplied screw through the right side of the heat sink and into the bracket
l
 
1
Annual average high temperature – the average of the 12 monthly average highs, for example:
Refer to
http://www.weatherbase.com/
24
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
Indoor Installation
20 cm / 8"
1
is
between inverters
40 cm / 16"
1
is
between inverters
to find the value in your location.
Clearance
Outdoor Installation
3 cm / 1.2" between inverters (if
inverters are also installed one above
the other, maintain the indoor
installation clearance)