Grounding screw: for connecting an optional secondary grounding cable.
l
 
AC and DC conduit entries: Connection points of the Connection Unit.
l
 
Two communication glands, for connection of communication options. Each gland has three 
l
openings. Refer to Setting Up Communication     on page 52 for more information.
 
ON/OFF/P Switch:
l
 
ON (1)   -  Turning this switch ON (after optimizer pairing) starts the operation of the power 
o
optimizers, enables power production and allows the inverter to begin exporting power to the 
utility grid
 
OFF (0) - Turning this switch OFF reduces the power optimizer voltage to a low safety voltage and 
o
inhibits exportation of power. When this switch is OFF, the Primary and Secondary Units' control 
circuitry remains powered up.
 
P - Moving and releasing the switch   a llows viewing system information via the LEDs and on the 
o
SolarEdge SetApp mobile application screen and performing functions:
P Position duration
Switch moved to P for less than
5 seconds, then released.
Switch moved to P for more than
5 seconds, then released.
LEDs
 
LEDs: three LEDs indicate, by color and state (on/ off/ blinking
l
information, such as errors or performance indications. 
Generally, the main   L ED indications are:
 
Blue ON - the inverter is communicating with the monitoring platform
l
 
Green ON - the system is producing
l
 
Green blinking - AC is connected but the system is not producing
l
 
Red ON - system error
l
1 Blinking = Turns ON and OFF for the same duration
2 Flickering = Turns ON for 100 mS and turns OFF for 5 seconds
Extended Power Commercial Inverter Installation Guide MAN-01-00402-1.0
Chapter 3: Installing the Primary and Secondary Unit(s)
Figure 7: ON/OFF/P switch
Function
Displays production information for 5
o
seconds on the SetApp screen.
Displays error type indications (if exist)
o
for 5 seconds.
Activates the Wi-Fi access point for
o
connecting to the SolarEdge Inverter
SetApp
Starts pairing
Comments
While the switch is in
P, all LEDs are ON
1
2
/ flickering
), different system 
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se82.8kSe55kSe100kSe66.6k

Table of Contents