Introduction; History; Checking The Consignment - Siemens SIPART PS2 series Hardware Installation Manual

Smart valve positioner venting gauge block
Hide thumbs Also See for SIPART PS2 series:
Table of Contents

Advertisement

Introduction

These instructions contain all information required to commission and use the device. Read
the instructions carefully prior to installation and commissioning. In order to use the device
correctly, first review its principle of operation.
The instructions are aimed at persons mechanically installing the device, connecting it
electronically, configuring the parameters and commissioning it, as well as service and
maintenance engineers.
1.1

History

The contents of these instructions are regularly reviewed and corrections are included in
subsequent editions. We welcome suggestions for improvement.
The following table shows the most important changes in the documentation compared to
each previous edition.
Edition
10/2014
1.2

Checking the consignment

1. Check the packaging and the delivered items for visible damage.
2. Report any claims for damages immediately to the shipping company.
3. Retain damaged parts for clarification.
4. Check the scope of delivery by comparing your order to the shipping documents for
correctness and completeness.
Venting Gauge Block Installation Instructions
Hardware Installation Manual, 12/2014, A5E34388399-AD
Remarks
First edition of Installation Instructions for the SIPART PS2 Venting Gauge Block.
WARNING
Using a damaged or incomplete device
Danger of explosion in hazardous areas.
• Do not use damaged or incomplete devices.
1
5

Advertisement

Table of Contents
loading

Table of Contents