SolarEdge StorEdge Installation Manual page 67

Hide thumbs Also See for StorEdge:
Table of Contents

Advertisement

System Configuration
 2.  Select Energy Manager. The following screen is displayed:
L i m i t
E n e r g y
S t o r a g e
Limit Control: For power limitation (including export limitation) configuration. This option can be 
used in parallel to energy control. For more information refer to 
http://www.solaredge.com/files/pdfs/products/feed-in_limitation_application_note.pdf. 
 
E: Export (Feed-in) limit
o
 
P: Production limit 
o
 
Dis: Disabled - no limit 
o
Energy Control: The method by which to manage the energy. 
Storage Control: Enables reserving a minimum battery charge level.
 3.  Select Energy Ctrl.. The following is displayed, showing the SolarEdge applications:
M a x
S e l f - c o n s u m e
T i m e
B a c k u p
D i s a b l e
Max Self-consume (MSC): Maximize Self-consumption .
Time of Use (TOU): Profile Programming.
Backup Only: Supply power to loads during power outage.
Disable: No energy control, that is, the battery is not used.
To set up maximum self-consumption:
 1.  Access the Energy Control menu as described above.
 2.  Select Max Self-Consume. The Energy Manager screen changes to display the following:
L i m i t
E n e r g y
S e t
O p e r a t i o n
S t o r a g e
66
C o n t r o l < D i s >
C t r l
< D i s >
C o n t r o l
o f
U s e
O n l y
C o n t r o l < D i s >
C t r l
< M S C >
C o n t r o l
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0