Configuring the RS485 Bus for Battery and Meter Connection
8. Select Battery Info and check the b attery information:
S N :
< s e r i a l
M o d e l :
R a t e d
F W
V e r .
To verify the connection:
1. Press the inverter external LCD light button to display the status screens one after the other:
a. Check the RS485 communication status:
w w w w w w w w
R S 4 8 5 - 1 < M L T > < 0 2 > < 0 2 >
The number under Prot (protocol) should display the number of configured devices.
l
The number under ## should display the number of communicating devices.
l
The above screen shows an example of 2 d evices on the same bus (e.g. meter and battery). If
RGM is pre-installed, and a battery and an external meter are also installed, the screen should
show <3><3>.
If the number of devices under Prot does not match the number u nder ##, refer to
Troubleshooting on page 79
b. Check the meter(s): In the meter(s) status screen check that the status is OK. The following is an
example of the status of an Export (or Export+Import) meter:
E x p o r t
S t a t u s :
< E r r o r
T o t a l [ W h ] : X X X X X X X
If Comm. Error appears, refer to Troubleshooting on page 79.
c. Check the battery information: identification, charging status and power, and the operating
mode.
B S N :
S O E : 8 9 %
T o t a l :
S t a t e :
If Comm. Error appears, refer to Troubleshooting on page 79.
64
# >
< X X X X X X >
P W R [ k W H ] :
N / A
< X X X X X >
D e v
P r o t
M e t e r
< O K >
M e s s a g e >
X X X X X X X X X
I D : 2 4
W W W W W
P W R :
0 W h
I d l e
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
# #
0 W