Configuring the RS485 Bus for Battery and Meter Connection
 8.  Select Battery Info and check the   b attery information:
S N :
< s e r i a l
M o d e l :
R a t e d
F W
V e r .
To verify the connection:
 1.  Press the inverter external LCD light button to display the status screens one after the other: 
 a.  Check the RS485 communication status: 
w w w w w w w w
R S 4 8 5 - 1 < M L T > < 0 2 > < 0 2 >
 
The number under Prot (protocol) should display the number of configured devices.
l
 
The number under ## should display the number of communicating devices.
l
The above screen shows an example of 2   d evices on the same bus (e.g. meter and battery). If 
RGM is pre-installed, and a battery and an external meter are also installed, the screen should 
show <3><3>.
If the number of devices under Prot does not match the number   u nder ##, refer to 
Troubleshooting on page 79
 b.  Check the meter(s): In the meter(s) status screen check that the status is OK. The following is an 
example of the status of an Export (or Export+Import) meter:
E x p o r t
S t a t u s :
< E r r o r
T o t a l [ W h ] : X X X X X X X
If Comm. Error appears, refer to Troubleshooting on page 79.
 c.  Check the battery information: identification, charging status and power, and the operating 
mode.
B S N :
S O E : 8 9 %
T o t a l :
S t a t e :
If Comm. Error appears, refer to Troubleshooting on page 79.
 
64
# >
< X X X X X X >
P W R [ k W H ] :
N / A
< X X X X X >
D e v
P r o t
M e t e r
< O K >
M e s s a g e >
X X X X X X X X X
I D : 2 4
W W W W W
P W R :
0 W h
I d l e
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
# #
0 W

Advertisement

Table of Contents
loading

Table of Contents