Step 1: Mounting And Grounding The Power Optimizers - SolarEdge SE5000H-US Installation Manual

Hd-wave
Hide thumbs Also See for SE5000H-US:
Table of Contents

Advertisement

Step 1: Mounting and Grounding the Power Optimizers

NOTE
The images contained in the following sections are for illustrative purposes only and may vary
depending on product models.
Step 1: Mounting and Grounding the Power
Optimizers
For each of the power optimizers
 1. Determine the power optimizer mounting location and use the power optimizer mounting brackets 
to attach the power optimizer to the support structure (See Figure 3). For frame-mounted power
optimizers follow the instructions supplied with the optimizers.
 2. If required, mark the mounting hole locations and drill the hole.
CAUTION!
Do not drill through the power optimizer or through the mounting holes. The drilling vibrations can
damage the power optimizer and will void the warranty.
Ne pas percer à travers la optimiseur de puissance ou ses trous de fixation. Les vibrations qui en
résulteraient peuvent endommager la optimiseur de puissance.
 3. Attach each power optimizer to the rack using the M6 (1/4'') stainless steel bolts, nuts and washers.
Apply torque of 9.5 N*m / 7 lb*ft. For 3NA series power optimizes, SolarEdge recommends mounting 
the power optimizer on a rail with the smooth side facing out, so that the power optimizer body will 
prevent its rotation.
 4. Use the following methods to ground the power optimizer
WARNING!
The metallic enclosure of the power optimizer must be grounded in accordance with the
requirements of the local and national codes.
L'enceinte métallique de l'optimiseur de puissance doit être mise à la terre en accord avec les
régulations locales et nationales.
For mounting on a grounded metal rail: Use the provided 5/16'' stainless steel grounding star 
l
washer between the railing and the flat side of the mounting bracket.   T he grounding washer 
should break through the anodize coating of the railing to ensure low resistive connection. Apply 
torque of 9.5 N*m / 7 lb*ft.
Figure 3: Power optimizer installation and grounding using a star washer
1 Not applicable to smart modules.
2 For a list of racking models and their appropriate grounding method, refer to
http://www.solaredge.us/files/pdfs/grounding_se_power_optimizers.pdf
14
1
SolarEdge HD-Wave Inverter Installation Guide MAN-01-00306-1.0
2
:
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents