Verifying Storedge Components Functionality - SolarEdge SE7600A-US Installation Manual

Storedge solution with backup
Hide thumbs Also See for SE7600A-US:
Table of Contents

Advertisement

Verifying StorEdge Components Functionality

 5.  To set up the level of charging from AC, do the following: 
 a.  Select Energy Manager è Storage Control. The following is displayed:
B a c k u p
A C
 b.  Select AC Charge Li è Limit Type, and set one of the following limits: 
 
Set %PV to enter a limit as a percentage of year-to-date energy production.
l
 
Set kWh to enter a fixed annual energy limit.
l
 
Set None to unlimit the charging.
l
 6.  To set a minimum battery level used for backup, so that the battery will always have energy stored in 
case backup power is needed, select Backup Rsvd and set the required level of reserved energy as 
percentage of the battery capacity
 
For backup power + Smart Energy Management - according to user requirement
o
 
For backup-only - according to battery manufacturer recommendation, if provided.
o
Verifying StorEdge Components Functionality
Upon installation and configuration completion, the system should be operating according to the 
selected StorEdge application.
This section describes how to verify that all system components are functioning as expected.   I f not, refer 
to Troubleshooting on page 93. 
To check the meter and inverter:
 1.  Verify that AC is ON. 
 2.  Check the meter (installed in export or consumption position, CT arrows point to the grid): 
 a.  Turn the inverter ON/OFF switch to OFF.
 b.  Connect loads on one of the measured phases.
 c.  Press the external LCD light button to display the Import or Consumption meter status screen, 
and check that the import or consumption energy (Energy[Wh]) is greater than 0 (may take a few 
minutes, depending on the loads size):
I m p o r t
S t a t u s :
P o w e r [ W ] :
E n e r g y [ W h ] :
 d.  Press the LCD light button to display the Export meter status screen, and check that the Export 
power is equal to zero.   I f it is not zero, check the CT direction on all connected phases.
 3.  Turn the inverter ON/OFF switch to ON.
 4.  Turn the Connection Unit switch to ON.
 5.  While the modules are exposed to sunlight (PV system is connected to the grid and the inverter is 
producing power), press the inverter LCD light button to display the power status screen, and check 
that the grid AC output (Vac) increases to 220-240V, and the total AC output power produced (Pac):
V a c [ V ]
2 4 0 . 7
P _ O K :
. . . . . . . . . . . . . . . . .
90
R s v d
< N / A >
C h a r g e
L i < N o n e >
M e t e r
< O K / E r r o r # >
x x x x x . x
X X X X X . X
V d c [ V ]
P a c [ W ]
w
3 7 1 . 9
2 3 4 9 . 3
X X X / Y Y Y
< S _ O K >
O N
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seauto-tx-5000

Table of Contents