DIP Switch Setup
DIP Switch Setup
Verify that the DIP switches on the system components are set as described in this section, according to 
the system hardware configuration. 
DIP Switch Setup in Meter and Inverter
Termination and bias guidelines:
 
The last external meter in the RS485 chain should be terminated with 120 Ohm (either internal or 
l
external).
 
Inverter communication board (Figure 23): 
l
 
If a meter is installed: No termination - Left SW7 switch Down 
o
 
If a meter is not installed: termination ON - Left SW7 switch Up (see also Creating an RS485 Bus 
o
Connection on page 77)
Figure 23: RS485 termination switch on the inverter communication board
 
38