Chapter 5: Meter Installation - SolarEdge SE7600A-US Installation Manual

Storedge solution with backup
Hide thumbs Also See for SE7600A-US:
Table of Contents

Advertisement

Chapter 5: Meter Installation

The StorEdge solution requires connecting a meter   f or   S mart Energy Management applications, such as  
maximizing self-consumption. For backup power only, installing a meter is not required.Refer to the table on 
page 10.
To install the SolarEdge meter, refer to the installation guide supplied with it: 
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide-na.pdf.
The meter is connected to the inverter using RS485.                
RS485 wiring specifications:
 
Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E STP) 
l
may be used)
 
Wire cross-section area: 0.2-1 mm²/ 24-18 AWG (a CAT5 cable may be used)
l
NOTE
The inverter RS485 bus should be connected to the battery and meter. Connecting
multiple inverters with RS485 master-slave connection may require an RS485
Expansion Kit (available form SolarEdge; Refer to
http://www.solaredge.com/files/pdfs/RS485_expansion_kit_installation_
guide.pdf).
For communication connection refer to Connecting Communication to the Meter on page 40.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
Chapter 5: Meter Installation
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seauto-tx-5000

Table of Contents