SolarEdge SE7600A-US Installation Manual page 27

Storedge solution with backup
Hide thumbs Also See for SE7600A-US:
Table of Contents

Advertisement

 5.  Align the two indentations in the inverter enclosure with the two triangular mounting tabs of the 
bracket, and lower the inverter until it rests on the bracket evenly.
 6.  Secure the Connection Unit bracket to the wall:
 
Mark the location of the bracket screw for the Connection Unit and drill the hole.
l
 
Fasten the bracket using a standard bolt.
l
 
Verify that the bracket is firmly attached to the mounting surface.
l
 7.  Insert the two supplied screws through the outer heat sink fin on both sides of the inverter and into 
the bracket (see Figure 12). Tighten the screws with a torque of 4.0 N*m / 2.9 lb.*ft.
 8.  Remove the inverter cover: Open the inverter cover's six Allen screws and carefully pull the cover 
horizontally before lowering it.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
Figure 12: Hanging the inverter on the bracket
Figure 13: Connection Unit bracket
Chapter 3: Installing the Inverter
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seauto-tx-5000

Table of Contents