Revision History - SolarEdge SE7600A-US Installation Manual

Storedge solution with backup
Hide thumbs Also See for SE7600A-US:
Table of Contents

Advertisement

Revision History

Version 1.3 (Oct. 2017)
 
In Power Optimizer Installation chapter: 
l
 
Added warning about grounding the power optimizer metallic enclosure 
o
 
Added: circuit conductors must be sized according to NEC 690.9 when combining strings
o
 
Removed reference to racking models and their grounding methods
o
 
Removed mentioning of tracker
o
 
In inverter Installation chapter:
l
 
Added a caution about not altering the Connection Unit enclosure: SolarEdge does not permit 
o
opening or puncturing the Connection Unit in any location other than the pre-defined drill guide 
locations, or otherwise altering the construction of the enclosure, as this may compromise safety 
and will void the warranty. 
 
Connection to/from the Connection Unit:
l
 
450V DC to BAT connector (DC- and DC+ connections) corrected in the connection diagram
o
 
Added a diagram of LG battery connection to inverter with 3 DIP switches 
o
 
In Configuration Menu Options:
l
 
Power Control section:
o
 
Removed Phase Balance link and info
n
 
Added a note about compliance with UL 1741 Supplement A.
n
 
Added link to P(Q) diagram application note
n
 
Maintenance section:
o
 
Added links to application notes (Upgrading the inverter using SD card; Isolation fault 
n
troubleshooting; Arc fault detection)
 
Removed Optimizer Conf
n
 
In System Configuration chapter: 
l
 
The communication board firmware (CPU) version must be 3.xxxx and later on all SolarEdge 
o
inverters at the same site
 
Screens changed when configuring LG battery
o
 
StorEdge Control instructions and menu updated
o
 
Connection Unit replacement - removed
l
 
Updated links
l
 
Technical specification - updated
l
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
Revision History
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seauto-tx-5000

Table of Contents