Revision History
Version 1.3 (Oct. 2017)
In Power Optimizer Installation chapter:
l
Added warning about grounding the power optimizer metallic enclosure
o
Added: circuit conductors must be sized according to NEC 690.9 when combining strings
o
Removed reference to racking models and their grounding methods
o
Removed mentioning of tracker
o
In inverter Installation chapter:
l
Added a caution about not altering the Connection Unit enclosure: SolarEdge does not permit
o
opening or puncturing the Connection Unit in any location other than the pre-defined drill guide
locations, or otherwise altering the construction of the enclosure, as this may compromise safety
and will void the warranty.
Connection to/from the Connection Unit:
l
450V DC to BAT connector (DC- and DC+ connections) corrected in the connection diagram
o
Added a diagram of LG battery connection to inverter with 3 DIP switches
o
In Configuration Menu Options:
l
Power Control section:
o
Removed Phase Balance link and info
n
Added a note about compliance with UL 1741 Supplement A.
n
Added link to P(Q) diagram application note
n
Maintenance section:
o
Added links to application notes (Upgrading the inverter using SD card; Isolation fault
n
troubleshooting; Arc fault detection)
Removed Optimizer Conf
n
In System Configuration chapter:
l
The communication board firmware (CPU) version must be 3.xxxx and later on all SolarEdge
o
inverters at the same site
Screens changed when configuring LG battery
o
StorEdge Control instructions and menu updated
o
Connection Unit replacement - removed
l
Updated links
l
Technical specification - updated
l
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3