 5.  Verify that each power optimizer is securely attached to the supporting structure or the module.
 6.  Record power optimizer serial numbers and locations, as described in "Step 4: Reporting and 
Monitoring Installation Data" on page 50
Step 2: Connecting a PV Module to a Power
Optimizer
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the plus and
minus input and output connectors.
For each of the power optimizers:
 
Connect the Plus (+) output connector of the module to the Plus (+) input connector of the power 
l
optimizer.
 
Connect the Minus (-) output connector of the module to the Minus (-) input connector of the 
l
power optimizer.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
Figure 4: Power optimizer grounding terminal
Figure 5: Power optimizer connectors
Chapter 2: Installing the Power Optimizers