Appendix C: Replacing and Adding System Components

Appendix C: Replacing and Adding System
Components
This appendix includes replacement procedures for the SolarEdge system components. 
NOTE
If you are permanently disassembling the installation or part of it, make sure to use the disposal
methods dictated by local regulations.

Replacing an Inverter

 1.  Turn OFF the Connection Unit.
 2.  Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe 
(<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five
minutes for the input capacitors of the inverter to discharge.
Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur l'écran
LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient déchargés.
 3.  Turn OFF the AC switch at the distribution panel.
 4.  Turn OFF the battery auxiliary power switch and the circuit breaker switch.
 5.  Open the Connection Unit cover.
 6.  Turn the Bypass switch inside the Connection Unit to position 2, in order to maintain power to the 
backed-up loads. 
 7.  Disconnect the meter, battery, AC and DC wires from the Connection Unit.
 8.  Remove the screws securing the inverter to the mounting bracket and remove the inverter (with the 
Connection Unit) from the mounting bracket.
NOTE
If you remove the old inverter and do not immediately install a new one,then:
Lock the Connection Unit in the OFF position using a lock on the switch.
o
Use insulation tape to isolate each of the AC and DC wires.
o
Seal the open conduits using duct tape.
o
 9.  Place the new inverter on the mounting bracket; insert the screws securing the inverter to the 
mounting bracket. 
 10.  Connect all the wires to the inverter: Follow the instructions of StorEdge Inverter Connections on page 
30 and Commissioning the Installation on page 44.
 11.  Configure the system to the required application as described in System Configuration on page 81
 

9V Battery Replacement

If Warning 8: Connection Unit Low 9V Battery is displayed in the main status screen, replace the 9V 
battery in the Connection Unit.
104