Error #
Error #
Single
Three
Phase
Phase
Inverters
Inverters
29-30
31, 33
64/65/66 AC Voltage
32, 41
61/62/63,
67/68/69
34, 35
79/80/81,
82/83/84
SolarEdge Installation Guide – MAN-01-00057-2.0
LCD Message
Phase Balance
The monitoring
Error
hardware that
checks the balance
of each phase (L1-N
and L2-N) has
exceeded its limit.
This error is checked
only in the USA.
Grid voltage is
Too High
above the limit
(Line 1/2/3)
permitted in this
country.
AC Voltage
Grid Voltage is
Too Low (Line
below the limit
1/2/3)
permitted in this
country.
AC Freq Too
Grid frequency is
High / Low
above / below the
(Line 1/2/3)
limit permitted in
this country.
Errors and Troubleshooting
Description
Check the grid connection.
Check the GND wire
connection.
Check the L1, L2 and
Neutral wire connections.
Verify symmetric load
between L1 and L2.
Consult the local grid
authority.
Turn off the inverter and
verify AC grid voltage.
If the inverter is located far
from the connection point
to the grid, then use a wider
gauge AC wire.
Consult the grid operator.
If permitted by local
authorities, use the
SolarEdge Configuration
Tool to change the settings.
Refer to the SolarEdge
Installation Tool User
Guide for mode detail.
Consult the grid operator.
If permitted by local
authorities, use the
SolarEdge Configuration
Tool to change the settings.
Refer to the SolarEdge
Installation Tool User
Guide for mode detail.
Consult the grid operator.
If permitted by local
authorities, use the
SolarEdge Configuration
Tool to change the settings.
Refer to the SolarEdge
Installation Tool User
Guide for mode detail.