Perform the Commissioning – Workflow
NOTE:
If you are permanantly dismantaling the installation or part of it, make sure to use
the disposal method dictated by the regulations of the country in which the
inverters are installed.
To move one or more power optimizers from one inverter
to another in the same site:
1
Turn both inverters OFF, as described above.
2
Remove the necessary power optimizers from their inverter and connect them
to the strings of the other inverter.
3
Perform the Commissioning – Workflow, as described on page 33, on the
inverter to which power optimizers were added and only then perform the
Commissioning – Workflow on the inverter from which power optimizers
were removed.
CAUTION:
Commissioning must first be performed on the inverter to which power optimizers
were added, and only then on the inverter from which power optimizers were
removed. Otherwise, the inverter to which power optimizers were added may be
damaged.
Replacing and Adding System Components
SolarEdge Installation Guide – MAN-01-00057-2.0
,
as described on page 33.
42