After commissioning succeeds, the following message is displayed:
P a i r i n g
3
Since at this stage the ON/OFF switch at the bottom of the inverter is ON, the
power optimizers start producing power and the inverter starts converting
AC.
WARNING!
After you turn ON the ON/OFF switch of the inverter, the DC cables carry a high
voltage and the power optimizers no longer output a safe 1 V output.
After the initial connection to the AC and before the inverter starts
converting, it will first monitor the grid for the time span
regulations (the inverter LED flickers green). While the inverter is in Standby
mode, the following message is displayed:
R e m a i n i n g :
During this time, the inverter monitors the grid and verifies correct grid
voltage and frequency. This message indicates how many seconds remain
until the inverter will be in Production mode. This amount of time is in
accordance with the regulations of each country, and is typically between
three to five minutes.
The inverter then automatically goes to Production mode and produces power
(the inverter LED is steady green).
SolarEdge Installation Guide – MAN-01-00057-2.0
P a i r i n g
C o m p l e t e d
W a k i n g
Commissioning the Installation
U P . . .
0 5 1 S e c
36