Step 2, Pairing Power Optimizers to the
Inverter
After all connections are made, all the power optimizers must be logically paired
to their inverter before they can start working with it. This step describes how to
pair power optimizers to the inverter, meaning to assign each inverter to the
power optimizers from which it will produce power.
NOTE:
The power optimizer does not start producing power until it is paired with an inverter.
To pair the power optimizers to the inverter:
1
Turn the ON/OFF switch at the bottom of the inverter to OFF. Press and hold
down the inverter's LCD Light button for about 10 seconds. The following
screen is displayed:
K e e p
f o r
t o
e n t e r
R e m a i n i n g :
Continue to hold for five seconds more and you will see this screen:
T u r n
2
Turn the ON/OFF switch at the bottom of the inverter to ON within five
seconds. If you do not turn ON the inverter ON/OFF switch within five
seconds, the inverter then exits pairing mode.
The following screen is then displayed indicating that the inverter is
performing the process of pairing and is assigning power optimizers to the
inverter.
R e m a i n i n g
This message displays a countdown of the seconds until it completes the
pairing process. If pairing fails, an error is displayed. This error appears only
if the above steps were not followed. If an error appears, then follow the
pairing steps again.
SolarEdge Installation Guide – MAN-01-00057-2.0
h o l d i n g
p a i r i n g ,
m e n u . . .
P a i r i n g
S w i t c h
P a i r i n g
Commissioning the Installation
b u t t o n
r e l e a s e
3
T o
[ S e c ] :
s e c
o n
1 0 4
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents